Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-AOC | ₹6.1 Cr | L1 | Accepted-AOC Due to L1 Bidder |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹13 L
Closing Date
16 Jan 2021, 12:30 pmClosed
SE IWC MIRZAPUR
SEIWC MIRZAPUR IRRIGATION COLONY FATHA, MIRZAPUR
C.C. Lining work From km. 7.000 to Km. 11.000 and Earth work in Filling of External Section from km. 7.500 to km. 9.375, Km. 10.500 to km. 10.925 and Km. 15.200 to Km. 16.100 of Bakahar Marihan Feeder Channel.
2020_UPIDC_541722_2
NIT 07/SE/2020-21
Open Tender
Civil Works - Canal
Item Rate
365 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹13 L
28 Jan 2021
8 Jan 2021
16 Jan 2021
8 Jan 2021
16 Jan 2021
8 Jan 2021
Amount
Earth work in cutting with all type of ordinary soil mixed with cherry, moorum etc. including all initial lead and lift including excavation, refilling of excavated earth into trenches and making bed slope and side slope as per drawing & specification including all lead, lift, labour and T&P etc. complete in all respects.
Earth work in excavating other rocks by blasting and disposal of excavated materials as per direction of Engineer-in-charge and making bed slope and side slope as per drawing & specification including all lead, lift, labour and T&P etc. complete in all respects.
Preparation of subgrade for lining work including all cost of labour, T&P, Taxes etc. required for proper completion of work.
Laying Cement concrete M-20 grade for sleeper 200x 200 mm size including all cost of material, labour, T&P, Taxes etc., required for proper completion of work.
Centering and shuttering work for cement concrete including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
P/L 100 mm thick Local sand in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Supplying and laying LDPE film (200 micron) on subgrade before lining per sqm. including cost of all material, labour, T&P, Taxes etc. for proper completion of work.
Laying CC (1:2:4) M-15 with cement, course sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm in lining work including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Carriage, cutting, bending, binding & placing of steel reinforcement and binding wire including all cost of material, labour, T&P, Taxes etc. but excluding cost of binding wire, required for proper completion of work.
Making construction joint filled with sealing compound including cost of all material, labour, T&P, Taxes etc. require for proper completion of work.
Earth work in filling in embankment with good earth from approved barrow area including all lead lift, labour charges, T&P Taxes etc. along with proper dressing and wattering to bring OMC with proper vibro machenical compaction in all respects as per direction of Engg.-in-charge.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .