Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LQualified K NO 845 158 866 803 867 803 802 158 TEHSIL BHOPALGARH BASNI HARISINGH JODHPUR JODHPUR RAJASTHAN 342001 | JODHPUR | RAJASTHAN | 342001 | L1 | Qualified MII | |
| 2 | L2₹7.7 L+₹59,062.50 (8.33%)Qualified JODHPUR RAJASTHAN 342601 INDIA UDYAM RJ 22 0032294 08AAOFJ6374Q1ZB R M M MSME STATUS AS VERIFIED | JODHPUR | RAJASTHAN | 342601 | L2 | Qualified MII | |
| 3 | L3₹8.4 L+₹1.3 L (18.1%)Qualified 01 HINDUSTAN CHEMICAL LIME INDUSTRIES GRAM TIKARWARA POST VILLAGE BADERA TIKARWARA KATNI MADHYA PRADESH 483501 | KATNI | MADHYA PRADESH | 483501 | L3 | Qualified MII | |
| 4 | L4₹9.4 L+₹2.3 L (32.1%)Qualified 189K DEVENDRA KUMAR AGARWAL RAM LAXMAN COLONY WARD NO 6 NAWA CITY NAGOUR RAJASTHAN NAWA CITY | L4 | Qualified MII | |
| 5 | L5₹10 L+₹2.9 L (41.1%)Qualified ABHAY MARKET GHANA ROAD INSIDE MOOLRAJ BANKIDAS BANGLOW MERTA CITY JODHPUR NAGAUR RAJASTHAN 341510 INDIA | NAGAUR | RAJASTHAN | 341510 | L5 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
21 Jul 2025, 11:00 amClosed
Hydrated Lime for Bulk Supply as per IS 1540 (Part 2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6408296 Dated : 07-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director
DPS
(Acting on behalf of President of India) Department of Atomic Energy
Directorate of Purchase and Stores
Central Purchase Unit
V S Bhavan
Anushaktinagar
Mumbai-94 (.) Splitting
8038917
GEM/2025/B/6408296
Two Packet Bid
Hydrated Lime for Bulk Supply as per IS 1540 (Part 2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
365 days
Chaturvedi323303Stores Unit, Heavy Water Plant (Kota), PO ANUSHAKTI VIA KOTA
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
7 Jul 2025
7 Jul 2025
21 Jul 2025
Hydrated Lime for Bulk Supply as per IS 1540 (Part 2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6408296 Dated : 07-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director
(Acting on behalf of President of India) Department of Atomic Energy
Directorate of Purchase and Stores
Central Purchase Unit
Mumbai-94 (.) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8038917.pdf
GEM_BID
QAPANNEXI_aa7ebe44-2c11-424a-87e01751605375335_apoa2.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .