| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | +0.00% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L1₹3.0 CrAdmitted-Finance | +0.00% | ₹3.0 Cr | L1 | Admitted-Finance |
| 3 | L1₹3.0 CrAdmitted-Finance AT TIRTOL P O SHANKHESWAR P S TIRTOL DIST JAGATSINGHPUR PIN 754137 | TIRTOL | JAGATSINGHPUR | ODISHA | 754137 | +0.00% | ₹3.0 Cr | L1 | Admitted-Finance |
| 4 | L1₹3.0 CrAdmitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | +0.00% | ₹3.0 Cr | L1 | Admitted-Finance |
| 5 | L1₹3.0 CrAdmitted-Finance | +0.00% | ₹3.0 Cr | L1 | Admitted-Finance |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
11 Mar 2026, 5:00 pmClosed
C.C.E.R.W. Circle Cuttack
C.C.E.R.W. Circle Cuttack
Construction of road from Harinaba road, Biswanathapur to Bilahata road in the District of Cuttack for the year 2025-26
2026_CERWI_126535_15
Tender Online RWC-27-25
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Cuttack
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.0 L
Yes
10 Jun 2026
25 Feb 2026
12 Mar 2026
25 Feb 2026
11 Mar 2026
25 Feb 2026
25 Feb 2026 - 11 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority :- Chief Construction Engineer , Rural Works , Circle Cuttack
Name of Work :Construction of road fromHarinaba road, Biswanathapur to Bilahata road in the District of Cuttack under MMSY-TRIP for the year 2025-26.
Contract No: Tender On Line RWC-27/25
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0.00;[Re31]0.00 ROAD PROPER
0.00;[Re1]0.00 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 but excluding the charges of GST etc. complete & as per direction of the Engineer-in-Charge. 0.00;[Re24]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re2]0.00 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MOSRT&H specifications for Road & Bridges work (4th Revision).
0.00;[Re3]0.00 With mechanical lead upto 1000m 0.99;[Re27]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re4]0.00 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m 0.00;[Re13]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re5]0.00 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). 0.00;[Re3]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re6]0.00 Fine dressing and turfing including transportation by mechanical means with all lead and lift and placing of turf in position and ramming with thapies and including watering and cost of all labour, materials etc. complete as per Clause 309 of MORD Specification and as per direction of the Engineer in Charge. 0.99;[Re23]0.99 Sqm Excess(+) Full Conversion INR
0.00;[Re7]0.00 Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. 0.00;[Re30]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re8]0.00 Construction of granular sub-base by providing close grade granular sub-base grading-III material as per table-100-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H Specifications for Road & Bridges work (4th Revision) 0.00;[Re22]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re9]0.00 Providing and laying spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on old prepared surface and compacting with vibratory roller to achive the desire density as per Clause 406 of MoSRT&H specifications for road & bridges work as per the direction of the E.I.C. 0.99;[Re17]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re10]0.00 Providing & applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per clause 502 of MOSRT&H Specifications for Road & Bridges work (4th Revision) 0.00;[Re15]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re11]0.00 Providing & applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 of MOSRT&H Specifications for Road & Bridges work (4th Revision). 0.00;[Re15]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re12]0.00 Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) 0.99;[Re6]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re13]0.00 PCC M-15 grade in foundation bed using 40mm to 10 mm size crushed stone aggregates mixed by concrete mixer laying in layers and compacting by vibrator & all leads and lifts as per approved drawing & technical specification and as per section 1700& 2100 of MORTH specification for road and bridge works (latest revision) but excluding the charges of GST including cost conveyance etc required as directed by Engineer-in-charge. 0.99;[Re8]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re14]0.00 Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. 0.99;[Re14]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re15]0.00 Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of Engineer-in-Charge. 0.99;[Re6]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re16]0.00 Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. 0.00;[Re13]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re17]0.00 PCC M-15 grade in foundation bed using 40mm to 10 mm size crushed stone aggregates mixed by concrete mixer laying in layers and compacting by vibrator & all leads and lifts as per approved drawing & technical specification and as per section 1700& 2100 of MORTH specification for road and bridge works (latest revision) but excluding the charges of GST including cost conveyance etc required as directed by Engineer-in-charge. 0.99;[Re23]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re18]0.00 PCC M-15 grade in substructure bed using 40mm to 10 mm size crushed stone aggregates mixed by concrete mixer laying in layers and compacting by vibrator & all leads and lifts as per approved drawing & technical specification and as per section 1700& 2100 of MORTH specification for road and bridge works (latest revision) but excluding the charges of GST including cost conveyance etc required as directed by Engineer-in-charge. 0.99;[Re27]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re19]0.00 R.C.C work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.
0.00;[Re20]0.00 Foundation 0.00;[Re18]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re21]0.00 Substructure 0.00;[Re9]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re22]0.00 Superstructure 0.00;[Re29]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re23]0.00 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 0.00;[Re10]0.00 Rm Excess(+) Full Conversion INR
0.00;[Re24]0.00 R.C.C M-30 grade in wearing course using 20mm and down grade BHGCB chips of approved quality from approved quarry including hoisting lowering and laying in position in layers with proper packing and ramming by means of vibrator to proper slope and level including watering and curring with cost conveyance royality of all materials required for the work including all labour,T&P for the work etc complete but excluding the charges of GST in all respect as per the specification and direction of Engineer-in-charge. 0.00;[Re11]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re25]0.00 Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical specification Clauses 1000 and 1200 of MoRD and as per direction of the Engineer-in-Charge. 0.00;[Re8]0.00 qnl Excess(+) Full Conversion INR
0.00;[Re26]0.00 Providing and laying reinforced cement concrete pipe NP3 for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 of MoRD but excluding the charges of GST & as per direction of the Engineer-in-Charge.
0.00;[Re27]0.00 1000 mm dia Single row 0.00;[Re14]0.00 Rmt Excess(+) Full Conversion INR
0.00;[Re28]0.00 600 mm dia Single row 0.00;[Re21]0.00 Rmt Excess(+) Full Conversion INR
0.00;[Re29]0.00 Providing Rough stone dry packing/pitching in slope protection wall approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying cinveying and cost conveyance royality of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level but excluding the charges of GST as per direction of the Engineer-in-charge including dewatering if required. 0.99;[Re10]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re30]0.00 Providing and laying Filter media with granular crushed aggreates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wingwall return wall to the full height compared to firm condition complete as per drawing and technical specificationn clause 1204.3.8 including cost conveyance but excluding the charges of GST etc required as directed by Engineer-in-charge. 0.99;[Re1]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re31]0.00 Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 of MORD specification for Rural roads but excluding the charges of GST and as per direction of Engineer-in- charge. 0.00;[Re31]0.00 RM Excess(+) Full Conversion INR
0.00;[Re1]0.00 Providing and fixing of typical MMSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing . 0.00;[Re31]0.00 No Excess(+) Full Conversion INR
0.00;[Re2]0.00 Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2 of MoRD
0.00;[Re3]0.00 600mm equilateral triangle 0.00;[Re8]0.00 No Excess(+) Full Conversion INR
0.00;[Re4]0.00 600mm Circular 0.00;[Re8]0.00 No Excess(+) Full Conversion INR
0.00;[Re5]0.00 Providing and fixing of typical PMGSY Citizen sign board with logo as per MORD specifications and drawing. Two MS plates of 2mm thick, top & middle plate duly welded with MS flat iron 25mmx5mm size on back on edges. The flat iron frame of both plate will be welded to 2nos 75mmx75mm of 12SWG sheet tubes posts duly embeded in C.C. M-15 grade blocks of 600mmx600mmx750mm, 750mm below ground level. The top most dimond plate will be welded to middle plate by 47mmx47mm of 12SWG steel tube. All M.S. will be stove enameled on both sides. Lettering & printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quailty in required shade & colour. All sections of framed posts & steel tubes will be painted with primer & two coats of paint as per drawing clause 1701 and Annexure 1700.1 0.00;[Re1]0.00 No Excess(+) Full Conversion INR
0.00;[Re6]0.00 Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification.
0.00;[Re7]0.00 Fixing of Km. Stone 0.00;[Re2]0.00 No Excess(+) Full Conversion INR
0.00;[Re8]0.00 Fixing or 200m Stone 0.00;[Re11]0.00 No Excess(+) Full Conversion INR
0.00;[Re9]0.00 Guide Post (M-20) 0.00;[Re27]0.00 No Excess(+) Full Conversion INR
0.00;[Re10]0.00 MAINTENANCE
0.00;[Re11]0.00 Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge
0.00;[Re12]0.00 1st Year 0.00;[Re10]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re13]0.00 2nd Year 0.99;[Re13]0.99 Cum Excess(+) Full Conversion INR
0.00;[Re14]0.00 3rd Year 0.00;[Re6]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re15]0.00 4thYear 0.00;[Re26]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re16]0.00 5th Year 0.00;[Re22]0.00 Cum Excess(+) Full Conversion INR
0.00;[Re17]0.00 Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.
0.00;[Re18]0.00 1st Year 0.00;[Re24]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re19]0.00 2nd Year 0.00;[Re20]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re20]0.00 3rd Year 0.00;[Re1]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re21]0.00 4thYear 0.99;[Re12]0.99 Sqm Excess(+) Full Conversion INR
0.00;[Re22]0.00 5th Year 0.99;[Re31]0.99 Sqm Excess(+) Full Conversion INR
0.00;[Re23]0.00 Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.
0.00;[Re24]0.00 1st Year 0.00;[Re24]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re25]0.00 2nd Year 0.00;[Re7]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re26]0.00 3rd Year 0.00;[Re1]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re27]0.00 4thYear 0.99;[Re4]0.99 Sqm Excess(+) Full Conversion INR
0.00;[Re28]0.00 5th Year 0.00;[Re28]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re1]0.00 Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD technical specification Clause 503,508,510,1904 as per direction of the Engineer in charge.
0.00;[Re2]0.00 1st Year 0.99;[Re10]0.99 cum Excess(+) Full Conversion INR
0.00;[Re3]0.00 2nd Year 0.99;[Re19]0.99 cum Excess(+) Full Conversion INR
0.00;[Re4]0.00 3rd Year 0.00;[Re21]0.00 cum Excess(+) Full Conversion INR
0.00;[Re5]0.00 4thYear 0.00;[Re28]0.00 cum Excess(+) Full Conversion INR
0.00;[Re6]0.00 5th Year 0.00;[Re16]0.00 cum Excess(+) Full Conversion INR
0.00;[Re7]0.00 Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.
0.00;[Re8]0.00 1st Year 0.00;[Re6]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re9]0.00 2nd Year 0.00;[Re6]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re10]0.00 3rd Year 0.00;[Re6]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re11]0.00 4thYear 0.00;[Re6]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re12]0.00 5th Year 0.00;[Re6]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re13]0.00 Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.
0.00;[Re14]0.00 1st Year 0.00;[Re27]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re15]0.00 2nd Year 0.00;[Re27]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re16]0.00 3rd Year 0.00;[Re27]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re17]0.00 4thYear 0.00;[Re27]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re18]0.00 5th Year 0.00;[Re27]0.00 Nos. Excess(+) Full Conversion INR
0.00;[Re19]0.00 Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge
0.00;[Re20]0.00 1st Year 0.99;[Re29]0.99 Sqm Excess(+) Full Conversion INR
0.00;[Re21]0.00 2nd Year 0.00;[Re17]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re22]0.00 3rd Year 0.00;[Re4]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re23]0.00 4thYear 0.00;[Re22]0.00 Sqm Excess(+) Full Conversion INR
0.00;[Re24]0.00 5th Year 0.99;[Re11]0.99 Sqm Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
Tendernotice_2.pdf
PDF • 8.35 MB
BOQ_582941.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .