Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹48.3 L
EMD Value
₹48,305
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Vice Chairman KUDA
KUDA Office Hanumakonda
1ST YEAR MAINTENANCE OF 5 KM CENTRAL MEDIAN ON NH-163 OUTER PASS FROM CHAINAGE FROM 122.700 KM TO 127.965KM) KM FROM KARUNAPURAM FLYOVER TO RAMPUR TEXTILE PARK OF HANUMAKONDA DURING 2026-27- Nov 26026 to Oct -2027
743305
D/1666/2025, Dt.15/10/2026
OPEN
Other
WARANGAL (URBAN)
5 documents required · 5 mandatory
₹2,850.01
₹48,305
17 Oct 2026
17 Oct 2026
17 Oct 2026
HEDGE/SHRUB PLANTING ---------Cost of plants for Hedge (10% Casulaity Replacement)
Hedge / shrubs: planting : Digging the trenches of size 30 cms depth refilling the trench with red soil, FYM at 4:1 ratio internal transport of plants & planting the plants including the applicatuion of fertilises and pesticides etc.' complete , but excl the cost of fertilizes and plant material. =2*0.3m*5000m =3000sqm*10%=300sqmt
Watering Schedule For Hedge plants: Cost of water to the Hedge plants through tankers 5000 lts. Capacity once in a day 5 lts x 26 days/Month from April 2026 to March 27 ( 12 months) 3000 sqmts. X 5 lts. X 26days x 12 months / 5000 lts. Per tanker/ 5 tankers. =3000*5*26*12/25000=187.20 (Exclude rainy days)
Maintenance of hedge/shrub planting: i)Trimming once in 15 days, ii) Watering once in a day @ 5 Lts per day (Sub soil moisture shall be maintained continuously), the watering shall be carried out daily during Non-rainy days. iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt) etc., ( 12 months)
Tall plants at Middle of the median 3.00 mts. c/c------Cost of tall plants (10% Casuality Replacement)
Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
Watering Schedule For Tall plants: Cost of water to plants through tankers for watering 5000.00 lts. each trip capacity (5) trips per day 20.00 lts per plant in each watering (Apr-6, May - 6, June - 5, July - 3, Aug -2, Sep - 2, Oct - 3, Nov -3, Dec - 3, Jan - 4, Feb - 4, Mar- 5) = 46 1667*20*48/25000=61.35 Tanker Days
Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth for 12 Months for Tall plants.(Multirow plantation)
Individual shrub planting 1.00 mtrs c/c -----Cost of shrub plants (10% Casulity Replacement)
Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the pplication of fertilizers and pesticides (@ 20 gms /pit /sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
Watering Schedule For Shrub plants: Cost of water to plants through tankers for watering 5000.00 lts each trip capacity (5) trips per day 5.00 lts per plant in each watering for 15 days (July to Nov) a month for alternate days for 5 months and 26 days (Apr, May, June and Dec - March) a month for 7 Months. each shrub x @ 5 lts per time x 15 days /25000 = 10000*5*15*5/25000=150 each shrub x @ 5 lts per time x 26 days /25000 = 10000*5*26*7/25000=364 Total = 150+364=514
i) Trimming once in 15 days. ii)Watering once in two days @ 5 litres / per plant (sub soil moisture shall be maintained continuously).The watering shall be carried out during non-rainy days. iii)Formation of basins for each and every plant upto 1 ft.away from the plant. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., (a) With Manual watering (Rs. 437.58 as per HMDA rate is Rs. 380.70). For 12 Months =10000*380.70/100=38070*12 months = 456840
Manufacture supply delivery and fixing of MS gate of size 5x2.1m including cost and conveyance of hold pasts, all drops, all material and labour charges for fabrication and fixing for finished item of work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
5KM from Karunapuram to rampur NH 163.xlsx
TENDER_DOCUMENT • 0.01 MB
NH 5 KM karunapuram 57,50,000 Lakhs BOQ.xls
TENDER_DOCUMENT • 0.04 MB
NH 5 KM karunapuram 57, 50,000 Bid Docum.docx
TENDER_DOCUMENT • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .