| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹100.0 LAccepted-Finance | ₹100.0 L | L1 | Accepted-Finance OK |
| 2 | L2₹1.0 Cr+₹99,963.13 (1.00%)Accepted-Finance | ₹1.0 Cr+₹99,963.13 (1.00%) | L2 | Accepted-Finance OK |
| 3 | L3₹1.0 Cr+₹2.0 L (2.00%)Accepted-Finance | ₹1.0 Cr+₹2.0 L (2.00%) | L3 | Accepted-Finance OK |
Tender Value
₹100.0 L
EMD Value
₹99,963
Closing Date
25 Jun 2026, 5:00 pmClosed
Executive Engineer Zilla Parishad Raigad Alibag
Kuthebag Raigad Zilla Parishad Alibag
Construction Of 2nd floor of sabhapati nivasthan At- Kunte Bag , Tal-Alibag
2026_RAIGA_1307943_1
ZP-RAIGAD-WORKDIV-24-2026-27
Open Tender
Civil Works
Percentage
180 days
Tal- Alibag Dist.Raigad
RZP Registration Contractor AS PER TENDER(OPEN)
12 documents required · 12 mandatory
₹1,180
₹99,963
29 Jun 2026
11 Jun 2026
26 Jun 2026
11 Jun 2026
25 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item no 1 Removing rich mix cement concrete including staking the spoils as directed with all leads lifts etc complete | 2 | Job | 1,000 | ₹2,000 |
| 2 | Item no 2 Providing and laying cast in situ/readymix cement concrete M35 of trapped/grenite/quartize/gnesis meter of RCC column as per detailed design and drawing as directed including steel centering formwork coverd block Cover blocks laying pumping compaction finishing the formed surface with cement morter 1 :3 one cover blocks laying pumping compaction finishing the formed surface with cement mortar one has two three of sufficient minimum thickness to give a smooth and even surface or refining if special finish is to be provided and curing etc complete | 18.05 | Cmt | 15,067.58 | ₹2,71,897.87 |
| 3 | Item no 3 Providing second class burn brick missionary providing second class burn brick machinery with conventional is type bricks in cement mortar 1:6 in superstructure including striking joint racking out joints water in and scaffolding etc.complete | 121.55 | Cmt | 8,915.38 | ₹10,83,643.14 |
| 4 | Item no 4 Providing fabricating and erecting at site of work the Tubular steel structure as per standard design and specification having various fans in between process and in multiples of standard length of wire waves as specified as per standard specifications inclusive of cost of Steel tubular process tubular columns to release Foundation Bolt providing fabricating and erecting at site of work the Tubular steel structure as per standard design and specification having various fans in between process and in multiples of standard length of wire waves as specified as per standard specifications inclusive of cost of Steel tubular process tubular columns to release Foundation Bolt providing fabricating and erecting at site of work the Tubular steel structure as per standard design and specification having various fans in between process and in multiples of standard length of wire waves as specified as per standard specifications inclusive of cost of Steel tubular process tubular columns to release Foundation bolts plates not and bolts building wherever required it is | 8.07 | Mt | 1,17,475.73 | ₹9,48,029.14 |
| 5 | Item No 5 Providing and fixing UPVC roof made up of 3 layers roofing material of thickness 2 mm having weed providing and fixing UPVC roof made up of 3 layers roofing material of thickness 2 mm having weed of 1130 mm and of required length having tensile strain not less than 330 kilogram/cm2 including fastening with self drilling screw having washer made of stainless steel etc complete | 465.85 | Smt | 1,625.88 | ₹7,57,416.2 |
| 6 | Item no 6 Providing and fixing PVC coloured Ridge tiles over UPVC roofing where required having size 113 CM into 41 CM for reach including fastening with self drilling screw having washers made of stainless steel etc complete | 89.1 | Rmt | 1,412.7 | ₹1,25,871.57 |
| 7 | Item no 7 Providing and laying cast in situ oblique ready mix cement concrete in m providing and laying cast in situ oblique ready mix cement concrete in M providing and laying cast in situ oblique ready mix cement concrete in M providing and laying cast in situ oblique ready mix cement concrete in M providing and laying cast in situ oblique ready mix cement concrete in m-25 of trap quarterzite granite nices metal for RCC West lab and steps of staircases as per detailed design and drawings are directed including Steel centreing plywood Steel from work Steel props laying oblique pumping compaction finishing uneven and honey surface with C.M and steps of staircases as per detailed design and drawings are directed including Steel centreing plywood Steel from work Steel props laying oblique pumping compaction finishing uneven and honeycombed surface with c.m.1: 3 of sufficient minimum thickness to give a smooth and even surface are roughing the surface if special finish is to be provided and curing etc complete | 17.6 | Cmt | 14,157.34 | ₹2,49,183.34 |
| 8 | Item No 8 Providing and lying cast in situ/ ready mix cement concrete m – 35 of trapaur granite or quarters height organises metal for RCC beams and lintel aur granite or quarters height organises metal for RCC beams and lintel as per detailed design and drawings are as directed including Steel centreing form work cover block lying or pumping compaction refurning the surface is special finish is to be provided and curing ATC complete. | 3.46 | Cmt | 13,511.68 | ₹46,770.68 |
| 9 | Item No 9 providing and fixing in position TMT – 500 bar reinforcement of various diameters for RCC file caps putting, Foundation slabs beams columns canopies staircase navels staircase Naval Shahzad staircase navel Sajjad lintels parties copying pins arches etc as per detailed design drawings and schedules including cutting vending hooking the bars staircasecomplete navel Sajjad lintels parties copying pins arches etc as per detailed design drawings and schedules including cutting vending hooking the bar binding with wires welding and supporting as required complete | 3.95 | Mt | 91,845.97 | ₹3,62,791.58 |
| 10 | Item No 10 Providing internal cement plaster 12 mm thick in single Court in cement mortar once to 4 without 1:4 without Neeru finish to concrete are brick surfaces in all positions including scaffolding and curing etc complete | 622.07 | Smt | 290.09 | ₹1,80,457.39 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.14 MB
BOQ_2244241.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .