Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 CrAccepted-AOC NA | ₹2.3 Cr | 1 | Accepted-AOC Work Allotted |
| 2 | 2₹2.4 Cr+₹10.1 L (4.50%)Rejected-AOC | ₹2.4 Cr+₹10.1 L (4.50%) | 2 | Rejected-AOC Unallotted |
| 3 | 3₹2.4 Cr+₹14.1 L (6.25%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹2.4 Cr+₹14.1 L (6.25%) | 3 | Rejected-AOC Unallotted |
| 4 | 4₹2.4 Cr+₹14.4 L (6.41%)Rejected-AOC H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | ₹2.4 Cr+₹14.4 L (6.41%) | 4 | Rejected-AOC Unallotted |
| 5 | 5₹2.5 Cr+₹21.8 L (9.69%)Rejected-AOC HOUSE NO 280 4 RAJ NAGAR COLONY KAITHAL ROAD JIND 126102 | JIND | HARYANA | 126102 | ₹2.5 Cr+₹21.8 L (9.69%) | 5 | Rejected-AOC Unallotted |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
18 Sept 2023, 12:00 pmClosed
SANJEEV KUMAR
EE PHE Division No.2 Jind
Construction of canal based water works at village Chabri with arrangement of raw water by pumping form Chabri minor Distt. Jind
2023_HRY_310468_1
2023B74FB88D F5C9 49B1 85C6 C71F054E9EBA569PUH
Open Tender
Civil Works
Works
365 days
CHABRI
4 documents required · 4 mandatory
₹15,000
₹5.4 L
Yes
23 Nov 2023
11 Sept 2023
18 Sept 2023
11 Sept 2023
18 Sept 2023
11 Sept 2023
Amount
Providing and installation of raw wter pumping set 900 LPM 40mtr. head complete in all respect.
Provision for providing and intallation of electric pannel board for Raw and Clear water pumping set
Provision for providing and intallation of Raw water pumping set of 600 LPM 12mtr. head 5.00 BHP
Operation and Maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 4) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
Karambir Contractor(GSTN-06AMLPS2855C2ZX)
Kulbir Singh Contractor(GSTN-06ATZPS6352H1ZW)
Sunil Kumar(GSTN-06BMGPK6616K1ZU)
ROHTASH KUMAR CONTRACTOR(GSTN-NA)
VINAY KUMAR CONTRACTOR(GSTN-NA)
Sh. Ashok Kumar Sindhu(GSTN-NA)
VINAY KUMAR CONTRACTOR
Kulbir Singh Contractor
Sh. Ashok Kumar Sindhu
Karambir Contractor
Sunil Kumar
VINAY KUMAR CONTRACTOR
Kulbir Singh Contractor
Sunil Kumar
Karambir Contractor
ROHTASH KUMAR CONTRACTOR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .