Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹33.8 L−₹1.3 L (3.59%)Accepted-AOC | L2 | Accepted-AOC Being L1 accepted | |
| 2 | L1₹35.0 LRejected-AOC 371 21 RBL ROAD NEW HYEDERABAD COLONY LUCKNOW UTTAR PRADESH 226007 | LUCKNOW | UTTAR PRADESH | 226007 | L1 | Rejected-AOC Being L2 reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-TENDER COST AND EMD NOT SUBMITTED BY THE BIDDER |
Tender Value
₹32.3 L
EMD Value
₹64,514
Closing Date
11 Sept 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (E)
O/o Executive Engineer (Electrical) BSNL Electrical Division 1ST Floor, Bhopal House, Lalbagh Lucknow
Operation and Comprehensive maintenance of ElectroMechanical Services at RMC DC, First Floor, RTTC Bldg Kanpur Road, Lucknow.
2023_BSNL_165856_1
24/TEDL/BSNL/2023-24, dated 24.08.2023
Open Tender
Electrical Works
Item Rate
1095 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AO (Cash) BSNL O/o The PGMTD, LUCKNOW
₹64,514
16 Nov 2023
26 Aug 2023
12 Sept 2023
26 Aug 2023
11 Sept 2023
26 Aug 2023
SH-I, Operations & Comprehensive maintenance of following services (on round the clock basis) in at RMC DC, First Floor, RTTC Bldg., Kanpur Road, Lucknow as per details given in relevant section. E I & Fans complete with DLP trunking, 2X125 KVA EA Sets with automation panel, Split AC Units, LT Panel, Automation panel, Feeder Piller, MCCB with enclosure, Glow sign Board, Package AC Unit, UPC 2X40KVA and 1X15 KVA (As per inventory attached). Note: 1. The work is entrusted to operate the BMS system provided at site and maintain proper records as per instruction of EE (E)/SDE (E), the decision of Engineer Incharge shall be final and binding in this regard. 2. The total no of ___1__skilled and ___3____semiskilled labour per day are to be provided by firm and scheme of redeployment of labour shall be got approved by the Engineer Incharge. (a) 1st Year
SH-I, Operations & Comprehensive maintenance of following services (on round the clock basis) in at RMC DC, First Floor, RTTC Bldg., Kanpur Road, Lucknow as per details given in relevant section. E I & Fans complete with DLP trunking, 2X125 KVA EA Sets with automation panel, Split AC Units, LT Panel, Automation panel, Feeder Piller, MCCB with enclosure, Glow sign Board, Package AC Unit, UPC 2X40KVA and 1X15 KVA (As per inventory attached). Note: 1. The work is entrusted to operate the BMS system provided at site and maintain proper records as per instruction of EE (E)/SDE (E), the decision of Engineer Incharge shall be final and binding in this regard. 2. The total no of ___1__skilled and ___3____semiskilled labour per day are to be provided by firm and scheme of redeployment of labour shall be got approved by the Engineer Incharge. (b) 2nd Year
SH-I, Operations & Comprehensive maintenance of following services (on round the clock basis) in at RMC DC, First Floor, RTTC Bldg., Kanpur Road, Lucknow as per details given in relevant section. E I & Fans complete with DLP trunking, 2X125 KVA EA Sets with automation panel, Split AC Units, LT Panel, Automation panel, Feeder Piller, MCCB with enclosure, Glow sign Board, Package AC Unit, UPC 2X40KVA and 1X15 KVA (As per inventory attached). Note: 1. The work is entrusted to operate the BMS system provided at site and maintain proper records as per instruction of EE (E)/SDE (E), the decision of Engineer Incharge shall be final and binding in this regard. 2. The total no of ___1__skilled and ___3____semiskilled labour per day are to be provided by firm and scheme of redeployment of labour shall be got approved by the Engineer Incharge. (c)3rd Year
SH-II Servicing of EA Sets:- Replacement of low maintenance Battery for EA Set 150 AH Battery (MHD1500 or approved make)- 02 Nos.
Replacement of fine filters for 7 TR AC pkg-
Servicing of 125 KVA, Ashok Leyland make EA set including replacement of all consumables i.e. lube oil, mobile and diesel filters, air cleaner etc. as per recommended schedule and items( to be replaced/repaired) of Engine manufacturer. (Make as per recommendation of manufacturer).
COOL CONTROL CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .