Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-AOC GSTIN: 19AAAAA2503J1ZR, 19AAAAN2503J1ZR, 19AACCH9135N1Z1, 19AACFO0832E1ZL, 19ADAPG5283A1ZX, 19AEXPC3746A1ZGBANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | ₹23.2 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹23.7 LRejected-Finance GSTIN: 19AACCH9135N1Z1BIBIGRAM SOUTH NEAR JALALIA GIRLS HIGH SCHOOL MALDA ENGLISHBAZAR 732101 | ENGLISHBAZAR | MALDA | WEST BENGAL | 732101 | ₹23.7 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹24.0 LRejected-Finance GSTIN: 19AACCH9135N1Z1, 19AACFD3344C1ZV, 19AACFO0832E1ZL, 19ADAPG5283A1ZX, 19AEEPD6034P1Z8, 19AEXPC3746A1ZG, 19AGVPD9724H1ZT, 19AMFPD7752B1Z8, 19ANXPD9601L1ZB, 19AOXPD9320B1ZU, 19CAFPD9818Q1ZX, 19CEVPD1860E1ZC, 19CMLPD0247B1ZG00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹24.0 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L3 | HANNAN BUILDERS PRIVATE LIMITED L2 | NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00 | PART-A
Daily operation and upkeepment of 5 (five) Nos. 260 kw capacity centrifugal Pumping Machineries(Group I ), 2 (two) nos 160 kw centrifugal Pumping Machineries(Group II), 2 (two) 18.5 kw Back wash centrifugal pumping machineries, 2 (two)nos 7.5 kw Vacuum pumping machineries, 2 (two) nos Dewatering pumping machineries, Extended MCC Panel in the pump house accomodating feeding from three sources alongwith bus coupler having current carrying capacity 1250 A, Extended 280 KVAR APFC panel, LPBS Valves, Actuators, Flow Meters, Level Indicators, HOT Crane, etc complete by engaging experienced operators, electrician, helper as per instruction and upto the entire satisfaction of EIC.on round the clock basis ( three shift of operation) including switching ON/OFF of the Indoor and Outdoor Luminaires & other accessories as & when required including sweeping Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitationof the Pump House complex on daily-basis. | 366 | Days | 4,200 ₹15.4 L | 4,159.6 ₹15.2 L | 4,087.87 ₹15.0 L |
| 1.01 | ESIC Contribution of Empleyers for SL NO 1.0 (@3.25%) | 366 | Days | 105.37 ₹38,565.42 | 105.37 ₹38,565.42 | 105.37 ₹38,565.42 |
| 1.02 | EPF Contribution of Empleyers for SL NO 1.0 (@13%) | 366 | Days | 421.46 ₹1.5 L | 421.46 ₹1.5 L | 421.46 ₹1.5 L |
| 2.00 | PART-B
Periodial inspection, thrice in a month, by Electrical supervisor having valid Supervisors' certificate of competency from Directorate of Electricity( Licensing Board), Govt. of West Bengal or under any other State Govt. of India along with Pump Technician/ Supervisor.
Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House Building. The Supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy / fault free operational condition of each equipment i.e. ACBs L.T.PDB, capacitors, pumps, valves, Acuators Relays, Contactors, Timers, SFU along with in house light system . | 12 | month | 12,700 ₹1.5 L | 12,699.69 ₹1.5 L | 12,331 ₹1.5 L |
| 3.00 | Cleaning of contacts by CRC 226 spray in the MCC Panel Board, cleaning of all Terminal Sockets, Coils, greasing of Pump & Motor bearings, filling up lubricating oil, change of gland packing, etc along with minor repairing (if required) of the electro mechanical equipments by supplying necessary sundry materials/electro mechanical accessories as required , once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the log book with date | 12 | month | 5,600 ₹67,200 | 5,516.14 ₹66,193.68 | 5,356 ₹64,272 |
| 4.00 | Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt meter etc. and testing of all relays, LT breakers, earthing arrangement system by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit, twice in a year (preferably in the month of December and June) and submission of the test report in duplicate to Department in each case as required and as per direction of EIC | 2 | items | 2,12,000 ₹4.2 L | 2,05,980 ₹4.1 L | 2,00,000 ₹4 L |
| 5.00 | ADD Cess @ 1% | 1 | items | 23,736.2 ₹23,736.20 | 23,457.83 ₹23,457.83 | 23,012.24 ₹23,012.24 |
Tender Value
Refer Docs
EMD Value
₹47,600
Closing Date
19 Dec 2023, 2:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operation and maintenance of Centrifugal pumping machineries, L.T Panels ,and other electro-mechanical accessories at High Lift pumping Station at Dariapur of Southern Sector under Malda Arsenic Area Water Supply Scheme,(Phase-II).
2023_PHED_610443_5
WBPHED/EE/MLMD/NIeT_25 of 2023-24
Open Tender
Electrical Work/ Equipment
366 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹47,600
Yes
26 May 2026
4 Dec 2023
21 Dec 2023
4 Dec 2023
19 Dec 2023
4 Dec 2023
Amount
PART-A Daily operation and upkeepment of 5 (five) Nos. 260 kw capacity centrifugal Pumping Machineries(Group I ), 2 (two) nos 160 kw centrifugal Pumping Machineries(Group II), 2 (two) 18.5 kw Back wash centrifugal pumping machineries, 2 (two)nos 7.5 kw Vacuum pumping machineries, 2 (two) nos Dewatering pumping machineries, Extended MCC Panel in the pump house accomodating feeding from three sources alongwith bus coupler having current carrying capacity 1250 A, Extended 280 KVAR APFC panel, LPBS Valves, Actuators, Flow Meters, Level Indicators, HOT Crane, etc complete by engaging experienced operators, electrician, helper as per instruction and upto the entire satisfaction of EIC.on round the clock basis ( three shift of operation) including switching ON/OFF of the Indoor and Outdoor Luminaires & other accessories as & when required including sweeping Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitationof the Pump House complex on daily-basis.
ESIC Contribution of Empleyers for SL NO 1.0 (@3.25%)
EPF Contribution of Empleyers for SL NO 1.0 (@13%)
PART-B Periodial inspection, thrice in a month, by Electrical supervisor having valid Supervisors' certificate of competency from Directorate of Electricity( Licensing Board), Govt. of West Bengal or under any other State Govt. of India along with Pump Technician/ Supervisor. Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House Building. The Supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy / fault free operational condition of each equipment i.e. ACBs L.T.PDB, capacitors, pumps, valves, Acuators Relays, Contactors, Timers, SFU along with in house light system .
Cleaning of contacts by CRC 226 spray in the MCC Panel Board, cleaning of all Terminal Sockets, Coils, greasing of Pump & Motor bearings, filling up lubricating oil, change of gland packing, etc along with minor repairing (if required) of the electro mechanical equipments by supplying necessary sundry materials/electro mechanical accessories as required , once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the log book with date
Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt meter etc. and testing of all relays, LT breakers, earthing arrangement system by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit, twice in a year (preferably in the month of December and June) and submission of the test report in duplicate to Department in each case as required and as per direction of EIC
ADD Cess @ 1%
HANNAN BUILDERS PRIVATE LIMITED
DEY ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid