Loading…
Loading…
Tender Value
₹12.5 L
EMD Value
₹12,512
Closing Date
24 Aug 2026, 10:00 amDue tomorrow
Executive Engineer (RWS), kunthebag, alibag tal- a
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Repairing of Well karanje Adiwasiwadi G.P. Deole Tal- Poladpur, Dist.- Raigad
2026_RAIGA_1328393_1
RAIGAD/RWSS/53/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Tal- Poladpur, Dist.- Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹180
₹12,512
14 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item no1;- Excavation for foundation/pipe trenches in hard murum and boulders including removing the excavated material upto a distance of 50m and lifts as below stacking and spreading as directed normal dewatering preparing the bed for foundation and excluding backfilling etc. complete.Lift 0.0 to 1.50 m | 149.02 | Cum | 232.1 | ₹34,587.54 |
| 2 | Item no 2:- Excavation for foundation /pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50m and lifts as below stacking and spreading as directed normal dewatering preparing the bed for foundation and excluding backfilling etc. complete. Lift 1.5 to 3.0 m | 106.63 | Cum | 722.7 | ₹77,061.5 |
| 3 | Lift 3.0 to 4.50 m | 69.54 | cum | 753.5 | ₹52,398.39 |
| 4 | Lift 4.50 to 6.0 m | 80.14 | cum | 784.3 | ₹62,853.8 |
| 5 | Item no 3) Excavation for foundation / pipe trenches in hard rock by controlled blasting including trimming and levelling the bed by chiseling where necessary and remocing the excavated material and stacking it in measurable heaps within a distance of 50m from the area and lifts as below normal dewatering excluding backfilling etc. complete. Lift 6.00 to 7.50 m | 29.43 | cum | 1,037.3 | ₹30,527.74 |
| 6 | Lift 7.50 to 9.0 m | 29.43 | cum | 1,068.1 | ₹31,434.18 |
| 7 | Lift 9.00 to 10.50 m | 29.43 | cum | 1,098.9 | ₹32,340.63 |
| 8 | Item no 4) Dewatring the excavated trenches and pools of water in the building trenches/pipeline trenches will works by using pumps and other devices including disposing off water to safe distance as directed by Engineer in charge (including cost of machinery labour fuel) etc. Complete | 750 | BHP/HR | 97.9 | ₹73,425 |
| 9 | Item no 5) Providing and laying in situ following grades of CC M-15 of trap metal for foundation and bedding including dewatering form work compacting and curing finishing etc. complete | 6.09 | Cum | 6,469.1 | ₹39,396.82 |
| 10 | Item no 6) Providing and laying in situ following grades of CC of trap metal for foundation and bedding including dewatering form work compacting and curing finishing etc. complete. (A) RCC M 250 For Beam | 4.94 | Cum | 10,164 | ₹50,210.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.07 MB
BOQ_2274396.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].