| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | ₹13.5 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹14.2 L+₹67,661.25 (5.00%)Rejected-AOC | ₹14.2 L+₹67,661.25 (5.00%) | L2 | Rejected-AOC 2nd Lowest Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Dis-Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Dis-Qualified |
| Sl No | Description | Qty | Unit | SWASTIK ENTERPRISE L2 | Pradip Chandra Das L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling tile work in floors and roofs laid in cement Mortar including stacking material within 50 metres lead.15.23.1 For thickness of tiles 10 mm to 25 mm | 31.65 | m2 | 63.52 ₹2,010.63 | 60.5 ₹1,914.89 Lowest |
| 2.00 | Dismantling W.C. Pan of all sizes including disposal o
dismantled materials i/e malba all complete as per directions of Engincer-in- Charge. | 19 | Each | 116.23 ₹2,208.47 | 110.7 ₹2,103.3 Lowest |
| 3.00 | Dismantling doors, windows and clerestory windows (steel or Wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :15.12.1 Of area 3 sq.metres and below | 8 | Each | 317.84 ₹2,542.68 | 302.7 ₹2,421.6 Lowest |
| 4.00 | Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engincer-in-charge. | 30 | Each | 341.77 ₹10,253.25 | 325.95 ₹9,778.5 Lowest |
| 5.00 | Dismantling old plaster or skirting raking out joints and cleaning the
surface for plaster including disposal of rubbish to the dumping ground
within 50 metres lead. | 674.86 | m2 | 47.3 ₹31,922.57 | 45.05 ₹30,402.44 Lowest |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete above plinth level.5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 61.94 | Kg | 94.13 ₹5,830.47 | 89.65 ₹5,552.83 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal
of form for 5.9.5 Lintels, beams, plinth beams, girders, bressumers and
cantilevers | 3.63 | m2 | 638.77 ₹2,318.73 | 608.35 ₹2,208.31 Lowest |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofs
having slope up to 15° landings, balconies, shelves, chajjas, lintels,
bands, plain window sills, staircases and spiral stair cases above plinth
level up to floor five level, excluding the cost of centering, shuttering,
finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse
sand(zone-III) derived from natural sources : 3 graded stone aggregate
20 mm nominal size derived from natural sources). | 0.27 | m3 | 11,255.26 ₹3,072.69 | 10,719.3 ₹2,926.37 Lowest |
| 9.00 | Renewing glass panes, with putty and nails wherever,
necessary including racking out the old putty:14.5.1 Float glass
anes of nominal thickness 4 mm(weight not less than 10kg/sqm | 16.43 | m2 | 989.05 ₹16,250.05 | 941.95 ₹15,476.24 Lowest |
| 10.00 | Renewal of old putty of glass panes (length) | 52.42 | Rm | 48.72 ₹2,553.9 | 46.4 ₹2,432.29 Lowest |
Tender Value
₹13.5 L
EMD Value
₹27,076
Closing Date
2 Jun 2026, 2:00 pmClosed
SE PWD Silchar Building Circle Silchar
SE PWD Silchar Building Circle Silchar
Civil, Sanitary and Water supply and Electrical Work and Road Work
2026_PWBNH_52311_1
SBC/CS/2026-27/02/Gr-II
Open Tender
Civil Works - Building
Item Rate
180 days
Hailakandi Court Campus
As per NIT
5 documents required · 5 mandatory
₹500
₹27,076
Yes
SE PWD Silchar Building Circle Silchar
14 Jul 2026
13 May 2026
2 Jun 2026
13 May 2026
2 Jun 2026
13 May 2026
13 May 2026 - 2 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement Mortar including stacking material within 50 metres lead.15.23.1 For thickness of tiles 10 mm to 25 mm | 1 | m2 | 108.82 | ₹108.71 |
| 2 | Dismantling W.C. Pan of all sizes including disposal o
dismantled materials i/e malba all complete as per directions of Engincer-in- Charge. | - | Each | 345.61 | - |
| 3 | Dismantling doors, windows and clerestory windows (steel or Wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :15.12.1 Of area 3 sq.metres and below | - | Each | 4,292.86 | - |
| 4 | Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engincer-in-charge. | - | Each | 181.99 | - |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the
surface for plaster including disposal of rubbish to the dumping ground
within 50 metres lead. | - | m2 | 7,250.67 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete above plinth level.5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 8,197.46 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal
of form for 5.9.5 Lintels, beams, plinth beams, girders, bressumers and
cantilevers | 1 | m2 | 7,994.66 | ₹7,986.67 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs
having slope up to 15° landings, balconies, shelves, chajjas, lintels,
bands, plain window sills, staircases and spiral stair cases above plinth
level up to floor five level, excluding the cost of centering, shuttering,
finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse
sand(zone-III) derived from natural sources : 3 graded stone aggregate
20 mm nominal size derived from natural sources). | - | m3 | 8,820.29 | - |
| 9 | Renewing glass panes, with putty and nails wherever,
necessary including racking out the old putty:14.5.1 Float glass
anes of nominal thickness 4 mm(weight not less than 10kg/sqm | 1 | m2 | 368.71 | ₹368.34 |
| 10 | Renewal of old putty of glass panes (length) | - | Rm | 6,045.24 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
Tendernotice_2.pdf
PDF • 0.65 MB
BOQ_82731.xls
BOQ • 0.31 MB
FOB.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .