Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
6 Jul 2026, 3:00 pm
SE
Agra
Construction of Girls Hostel at K.G.B.V., Aliganj in District Etah.
2026_UPHDB_1159060_1
1686/UPHDB/DW-24/161 Date 04.06.2026
Open Tender
Civil Works - Buildings
365 days
Etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,310
Executive Engineer
₹4.9 L
Yes
10 Jun 2026
10 Jun 2026
7 Jul 2026
10 Jun 2026
6 Jul 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 671.12 | CUM | 129.24 | ₹86,735.55 |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 126.52 | CUM | 510.06 | ₹64,532.79 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 95.91 | CUM | 1,546.37 | ₹1,48,312.35 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | 104.47 | CUM | 4,960.03 | ₹5,18,174.33 |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or chordancewill be used The rate of application of chemical emulsion shallbe as follows : (1)Treatment for masonary & foundation 5 liters per/100 sqm.(2) Back fill in immediate contact with foundation 7.5 liters/100sqm (3) Treatment of top surface of plinth filling 5 liters/100 sqm (4)Treatment junction of wall and the floor 7.5 liters /100 sqm (5)Treatment of soil along external perimeter of building 7.5liters/100sqm. (6) Treatment of soil under apron along external perimter 5 liters/100 sqm. | 709.03 | SQM | 230 | ₹1,63,076.9 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Suspended floors, roofs, landings, balconies and access platform | 1,538.99 | SQM | 675.16 | ₹10,39,064.49 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : (b) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 882.49 | SQM | 536.2 | ₹4,73,191.14 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : (c) Foundations, footings, bases of columns, etc. for mass concrete | 29.07 | SQM | 285.54 | ₹8,300.65 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : (d) Columns, Pillars, Piers, Abutments, Posts and Struts | 160.45 | SQM | 699.95 | ₹1,12,303.48 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 247.35 | CUM | 8,377.51 | ₹20,72,177.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
kasturbaAlitech.pdf
Tender Documents • 11.98 MB
BOQ_2172299.xls
BOQ • 0.59 MB