| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | -14.99% | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.4 LAdmitted-Finance | -11.00% | ₹11.4 L | L2 | Admitted-Finance |
| 3 | L3₹11.5 LAdmitted-Finance | -9.99% | ₹11.5 L | L3 | Admitted-Finance |
| 4 | L4₹12.4 LAdmitted-Finance | -2.79% | ₹12.4 L | L4 | Admitted-Finance |
| 5 | L5₹13.1 LAdmitted-Finance | +2.00% | ₹13.1 L | L5 | Admitted-Finance |
Tender Value
₹12.8 L
EMD Value
₹12,796
Closing Date
26 Nov 2025, 3:00 pmClosed
Cheif Executive Officer Zilla Parishad Pune
Yashwantrao Chavan Bhavan Pune Camp Pune 411001
2. Providing Constructing Under Ground Drainage Line at Matalwadi Area of Bhugaon Village Tal Mulshi Dist Pune(Z.P.Regd.Unemployed Engineer)
2025_RDPUN_1248624_2
ZP/PUNE/RWS/E-Tender/ 15 /2025-26
Open Tender
Civil Works - Water Works
180 days
Pune
Please refer Tender Notice
3 documents required · 3 mandatory
₹590
₹12,796
Yes
23 Dec 2025
19 Nov 2025
27 Nov 2025
19 Nov 2025
26 Nov 2025
19 Nov 2025
Item No.1 :- Excavation for foundation / pipe trenches in earth, soil of all types, sand, gravel and soft murum & hard murum including removing the excavated material upto a distance of 50 M and lift upto 1.5 M, stacking and spreading as directed. Dewatering, showring and strutting, preparing the bed for the foundation etc. complete.
Item No.2 :- Excavation for foundation / pipe trenches in soft rock and old foundation and lime masonry foundation, asphalt road including removing the excavated material upto a distance of 50 M with lift upto 1.5 M stacking as directed dewatering, showring, structing, preparing the bed for the foundation and excluding back filling etc. complete.
Item No.3 :- Excavation for foundation / pipe trenches in soft rock / hard rock and old foundation and lime masonry foundation by controlled blasting / chiselling including trimming and leveling the bed by chisseling wherever required and removing the excavated material upto a distance of 50 M with lift upto 1.5 M stacking as directed dewatering, showring, structing, preparing the bed for the foundation and excluding back filling etc. complete.
Item No.4 :- Providing murum bedding in trenches with approved murum from excavated materials from fiundations / trenches in 15 to 20 cm layers including watering and compaction, etc. complete.
Item No.5 :- Providing at site of work ISI standard RCC pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST levied by GOI & GOM in all respect, including inspection charges, transport to departmental stores / site, unloading and stacking, etc. complete as per IS-458/1988.450 mm dia.NP-II Class RCC Pipe
300 mm dia.NP-II Class RCC Pipe
Item No.6 :- Lowering, laying and jointing in proper grade and alinement RCC pipes with collar joints in CM 1:1 proportion or socketed RCC pipes with rubber joints (excluding cost of rubber ring or RCC collar), including cost of conveyance from stores to site of work, cost of jointing materials, labour, hydraulic testing, etc. complete as directed by Engineer-in-charge.450 mm dia.NP-II Class RCC Pipe
300 mm dia.NP-II Class RCC Pipe
Item No.7:-Hydraulic testing of RCC pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide speci-fied test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position.450 mm dia.NP-II Class RCC Pipe
300 mm dia.NP-II Class RCC Pipe
Item No.8 :- Providing and constructing on sewer, B.B. masonry circuiar / Rectangular manhole with concentric cone 1.20 M dia. At bottom and 0.50 M dia. At top and upto a depth of 2.00 M with 23 cm thick brick work in CM 1:4 proportion, excluding excavation, including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.50 kgs, 1:2:4 coping and providing and fixing approved make and quality S.F.R.C. frame and cover of 56 cm dia. etc. complete as directed by Engineer-in-charge. Circular - Depth upto 1.00 M
Circular - Depth upto 1.50 M
Circular - Depth upto 2.00 M
Circular - Depth upto 2.50 M
Item No.10 :-Valve chamaber with precast RCC Covers providng and constructing BB Masonary in cm
Item No.11 :-Filling in plinth and floors / exavated trenches with approved excavated materials from foundation 15 cm to 20 cm layers including watering and compaction etc. complete.
Item No.12:- Conveying the excavated inactival balance soil on site of work as and where directed etc. complete. Lead upto 3.00 Km
Item No.13:- Providing and laying PCC M:150(1:2:4) for foundation
Item No.14:-Providing and fixing Information board of size 1.50 mx 1.20 m
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.95 MB
Tendernotice_2.pdf
PDF • 0.85 MB
Tendernotice_3.pdf
PDF • 0.06 MB
Tendernotice_4.pdf
PDF • 0.07 MB
Tendernotice_5.pdf
PDF • 0.56 MB
BOQ_2153397.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid