| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹21.9 LAWARDED | ₹21.9 L | AWARDED |
Tender Value
₹21.9 L
EMD Value
₹51,804
Closing Date
5 Nov 2025, 10:00 pmClosed
Directorate of Municipal Administration
Contraction of samudya bhavana at hyalya road ambedkara ngara 20th ward
DMA/2025-26/BD/WORK_INDENT39485/CALL-3
DMA/2025-26/BD/WORK_INDENT39485/CALL-3
Open
Buildings
Two Tender Document System(Two Cover)
DMA Town Panchayat Kotturu
₹550
₹51,804
28 Oct 2025
28 Oct 2025
6 Nov 2025
5 Nov 2025
Contraction of samudya bhavana at hyalya road ambedkara ngara 20th ward
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifcations, incl...
Filling available excavated earth(excluding rocks) in sides of the foundation upto plinth in layers not exceeding 20 cms etc.. Complete as per specification (Vol -1, P No.7, I.No 1.9)
Providing and laying in position plain cement concrete Mix 1 : 4 : 8 ( M7.5 ) Using 40 mm nominal size graded crushed coarse aggregates for levelling course for all works in foundation. The granite/tr...
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fne aggregates as per relevant IS Codes machine mixed...
Providing TMT steel reinforcement for RCC works including straightening cutting, bending, hooking placing in position laping etc., complete as per specification. (Vol-2, P.No.84, I.No.11.32)
Additionalities for Form Work, Centering & Scaffolding for concrete works percentage on finished rates.-footing
Additionalities for Form Work, Centering & Scaffolding for concrete works percentage on finished rates.- column
Additionalities for Form Work, Centering & Scaffolding for concrete works percentage on finished rates.-plinth beam
Additionalities for Form Work, Centering & Scaffolding for concrete works percentage on finished rates.-beams
Additionalities for Form Work, Centering & Scaffolding for concrete works percentage on finished rates.-rcc
Additionalities for Form Work, Centering & Scaffolding for concrete works percentage on finished rates.-lintel beams
5.4 Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour...
Providing 15mm thick cement plaster in single coat with CM 1:6 of brick masonry including rounding off corners wherever required smooth rendering providing and removing ascaffolding including cost o...
Providing 15mm thick cement plaster in single coat with CM 1:6 of brick masonry including rounding off corners wherever required smooth rendering providing and removing ascaffolding including cost o...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].