Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Finance | -48.11% | ₹17.1 L | L1 | Admitted-Finance |
| 2 | L2₹18.1 LAdmitted-Finance | -45.11% | ₹18.1 L | L2 | Admitted-Finance |
| 3 | L3₹19.5 LAdmitted-Finance | -40.99% | ₹19.5 L | L3 | Admitted-Finance |
Tender Value
₹33.0 L
EMD Value
₹65,960
Closing Date
6 Jan 2026, 2:00 pmClosed
commissioner municipal corporation alwar
municipal corporation alwar
Construction of drain from Fatehsingh Gumbad to Mandi Mod in Ward No. 47
2025_DLB_523273_1
Nit no 44/2025 wno 14
Open Tender
Civil Works
180 days
municipal corporation alwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
commissioner municipal corporation alwar
₹65,960
30 Jan 2026
25 Dec 2025
6 Jan 2026
25 Dec 2025
6 Jan 2026
25 Dec 2025
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m
Carriage of Materials by mechanical transport including loading,unloading And stacking Earth (3km)
1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size).
1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 1:4 (1 cement : 4 fine/ coarse sand)
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Hot rolled deformed bars
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
BOQ_933451.xls
BOQ • 0.99 MB
Download all tender documents and submit your bid