Loading…
Loading…
Tender Value
₹25.4 L
EMD Value
₹19,100
Closing Date
9 Jul 2026, 5:30 pm
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION
CHATRAPATI SHIVAJI BHAWAN, AGAR ROAD UJJAIN
CONSTRUCTION OF ADDITIONAL BADMINTON COURT IN SHALAKA BADMINTON HALL LOCATED AT MADHAV CLUB
2026_UAD_514062_1
294/ZONE4/E-TENDER/2026
Open Tender
Civil Works - Others
90 days
AT MADHAV CLUB
PLEASE REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹5,000
₹19,100
9 Jun 2026
9 Jun 2026
10 Jul 2026
9 Jun 2026
9 Jul 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides, disposal of excavated earthincludingofall lift and lead upto 50m. Disposed earth to be levelled and neatly dressed.
All kinds of soil. Vol-2 SOR Item No 2.6.1 | 137.4 | M3 | 151 | ₹20,747.4 | BI01010001010000000000000515BI0100001114 |
| 2 | Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering All work up to plinth level.
Cement concrete gradeM-15 (Nominal Mix) with 20 mm maximum size of stone aggregate. Vol-2 SOR Item No 4.1.3 | 11.81 | M3 | 4,755 | ₹56,147.04 | BI01010001010000000000000515BI0100001115 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
Cement concrete grade M-20 (Nominal Mix)with 20mm maximum size of stone aggregate. Vol-2 SOR Item No 5.1.1 | 57.72 | M3 | - | - | BI01010001010000000000000515BI0100001116 |
| 4 | Centering and shuttering including strutting, propping stretching etc. complete for and removal of formwork by sheet plateor plywood shuttering for : Vol-2 SOR Item No 19.1 | 97.12 | M2 | - | - | BI01010001010000000000000515BI0100001117 |
| 5 | Foundations, footings, bases of columns, etc. For mass concrete.
Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 302.4 | M2 | - | - | BI01010001010000000000000515BI0100001118 |
| 6 | Walls (any thickness) including attached pilasters, butteresses, plinth
and string courses etc Plinth Slab | 22.5 | M2 | - | - | BI01010001010000000000000515BI0100001119 |
| 7 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 286.08 | M2 | - | - | BI01010001010000000000000515BI0100001120 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral staircases upto floor two level excluding the cost of centering, shuttering and reinforcement with Cement concrete grade M-20 (Nominal Mix) with 20mm maximum size of stone aggregate. Vol-2 SOR Item No 5.3 | 18.72 | M3 | - | - | BI01010001010000000000000515BI0100001121 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, postsandstrutsetc.above plinth level and up to floor two level excluding cost of centering, shuttering and reinforcement etc.
Cement concrete grade M-20 (Nominal Mix) with 20mm maximum size of stone aggregate. Vol-2 SOR Item No 5.2.1 | 15.87 | M3 | - | - | BI01010001010000000000000515BI0100001122 |
| 10 | Brickwork with flyash lime bricks (FALG Bricks) conforming to IS:12894- 2002, class designation 50 (average compressive strength) in super structure above plinth level up to floor 2 level including thecost of scaffolding :
Cement mortar 1:4 (1 cement : 4 coarse sand) Vol-2 SOR Item No 6.14.1 | 95.04 | M3 | - | - | BI01010001010000000000000515BI0100001123 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
tender.pdf
Tender Documents • 1.85 MB
drawing.pdf
Other Document • 0.35 MB
estimate.pdf
Other Document • 0.71 MB
BOQ_619184.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid