Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹11.1 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.9 LAdmitted-Fee/PreQual/Technical/Finance SATSANG BHEJAPUT DAMANJODI KORAPUT ODISHA 763008 | KORAPUT | ODISHA | 763008 | ₹11.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹13.1 LAdmitted-Fee/PreQual/Technical/Finance MAIN ROAD BHEJAPUT DAMANJODI KORAPUT ODISHA 763008 | DAMANJODI | KORAPUT | ODISHA | 763008 | ₹13.1 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹13.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.3 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SARALA FABRICATION L8 | M/S SOBHA BISOI L10 | M/S SADASHIV ENTERPRISES L1 | CHINTAMANI ENTERPRISES L16 | M/S M H ZAMAN L3 | PADMANAV NAYAK L9 | M/S RAHUL CONSTRUCTION L7 | M/S. BATAKRISHNA SAHOO L13 | MS/ BABA BISWANATH CONSTRUCTION L4 | NSPP INDIA PRIVATE LIMITED L6 | S K ENGINEERING WORKS L17 | DIPAK ENTERPRISES L2 | M/s K.C. MUDULI L19 | M/S AMULYA CONSTRUCTION L12 | M/s P.K.RAY L15 | SURENDRANATH MALLICK L14 | S.C. DASH L18 | NILANCHAL NAHAK L11 | ASHOK KUMAR BEHERA L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | 1.1.2) Removing the excavated materials , debris of any description and other waste materials, spoil including loading into trucks/tractors using baskets by head loads or any other means and transporting by trucks/ tractors up to a distance of 1 km and unloading at the ear marked places inside plant, spreading levelling complete as directed by Engineer-in-charge. | 200 | Cum | 250 ₹50,000 | 190 ₹38,000 | 35 ₹7,000 Lowest | 575 ₹1,15,000 | 90 ₹18,000 | 110 ₹22,000 | 130 ₹26,000 | 350 ₹70,000 | 110 ₹22,000 | 165 ₹33,000 | 150 ₹30,000 | 45 ₹9,000 | 6,500 ₹13,00,000 | 2,500 ₹5,00,000 | 2,550 ₹5,10,000 | 350 ₹70,000 | 350 ₹70,000 | 120 ₹24,000 | 650 ₹1,30,000 |
| 2.002.8.0) Earth work in all kinds of soil in foundation, trenches or drains not exceeding 1.5m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus earth as directed within a lead of 50 M. Disposed soil to be levelled and neatly dressed. | ||||||||||||||||||||||
| 3.00 | 2.8.1) Same as item (02.08.00) above but in lift upto 1.5 m in all type of soil. | 150 | Cum. | 250 ₹37,500 | 280 ₹42,000 | 135 ₹20,250 | 570 ₹85,500 | 120 ₹18,000 | 195 ₹29,250 | 160 ₹24,000 | 210 ₹31,500 | 150 ₹22,500 | 180 ₹27,000 | 160 ₹24,000 | 105 ₹15,750 Lowest | 210 ₹31,500 | 250 ₹37,500 | 260 ₹39,000 | 210 ₹31,500 | 210 ₹31,500 | 150 ₹22,500 | 220 ₹33,000 |
| 4.0015.7) Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | ||||||||||||||||||||||
| 5.00 | 15.7.4) In cement mortar | 70 | Cum | 1,100 ₹77,000 | 550 ₹38,500 | 175 ₹12,250 | 550 ₹38,500 | 450 ₹31,500 | 650 ₹45,500 | 800 ₹56,000 | 800 ₹56,000 | 600 ₹42,000 | 600 ₹42,000 | 300 ₹21,000 | 235 ₹16,450 | 2,100 ₹1,47,000 | 130 ₹9,100 | 135 ₹9,450 | 800 ₹56,000 | 800 ₹56,000 | 450 ₹31,500 | 120 ₹8,400 Lowest |
| 6.00 | 15.58) Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to alead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. | 10 | Cum | 1,100 ₹11,000 | 700 ₹7,000 | 395 ₹3,950 Lowest | 985 ₹9,850 | 950 ₹9,500 | 849 ₹8,490 | 1,200 ₹12,000 | 1,400 ₹14,000 | 750 ₹7,500 | 1,100 ₹11,000 | 3,500 ₹35,000 | 650 ₹6,500 | 3,000 ₹30,000 | 2,000 ₹20,000 | 2,010 ₹20,100 | 1,400 ₹14,000 | 1,400 ₹14,000 | 1,000 ₹10,000 | 1,500 ₹15,000 |
| 7.00 | 02.25.00 ) Back filling with selected excavated earth or any other materials around the foundations, under floors, pavements or any other places in layers not exceeding 20 cm, watering and ramming, consolidating etc. complete lead upto 50m & lift upto 1.5m . | 100 | Cum | 200 ₹20,000 | 100 ₹10,000 | 60 ₹6,000 | 80 ₹8,000 | 90 ₹9,000 | 115 ₹11,500 | 110 ₹11,000 | 135 ₹13,500 | 90 ₹9,000 | 125 ₹12,500 | 150 ₹15,000 | 55 ₹5,500 Lowest | 175 ₹17,500 | 150 ₹15,000 | 160 ₹16,000 | 135 ₹13,500 | 135 ₹13,500 | 200 ₹20,000 | 120 ₹12,000 |
| 8.0004.01.00) Providing and laying plain cement concrete at all depths below and upto ground level in foundations,fillings,non-suspended floors including tamping, curing etc. but excluding the cost of centering and shuttering etc. as specified or directed in any shape, position, thickness and finishing the top surface rough or smooth etc.all complete(CEMENT WILL BE ISSUED FREE OF COST AT NALCO'S STORE.) | ||||||||||||||||||||||
| 9.00 | 04.01.03) P.C.C 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 10 | Cum | 3,400 ₹34,000 | 3,400 ₹34,000 | 2,215 ₹22,150 | 3,920 ₹39,200 | 2,760 ₹27,600 | 4,050 ₹40,500 | 3,500 ₹35,000 | 3,900 ₹39,000 | 2,900 ₹29,000 | 3,450 ₹34,500 | 4,500 ₹45,000 | 2,150 ₹21,500 Lowest | 3,600 ₹36,000 | 3,500 ₹35,000 | 3,600 ₹36,000 | 4,500 ₹45,000 | 4,800 ₹48,000 | 3,800 ₹38,000 | 3,000 ₹30,000 |
| 10.00 | 04.01.08) P.C.C.1:4:8 (1 cement:4coarse sand:8 graded stone aggregate of 40 mm nominal size) | 10 | Cum. | 3,500 ₹35,000 | 3,200 ₹32,000 | 2,085 ₹20,850 Lowest | 3,125 ₹31,250 | 2,600 ₹26,000 | 3,750 ₹37,500 | 3,200 ₹32,000 | 3,700 ₹37,000 | 2,800 ₹28,000 | 3,200 ₹32,000 | 4,600 ₹46,000 | 2,100 ₹21,000 | 3,800 ₹38,000 | 3,500 ₹35,000 | 3,600 ₹36,000 | 4,500 ₹45,000 | 4,800 ₹48,000 | 3,700 ₹37,000 | 3,000 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
22 May 2026, 10:00 amClosed
DGM TnC
Nalco Damanjodi
CONSTRUCTION OF FOUNDATION AND ALLIED WORK FOR INSTALLATION OF SEED GRINDER AT 06 AREA IN ALUMINA REFINERY, NALCO, DAMANJODI
2026_NALCO_907858_1
TnC/AR/03/eC-3021
Limited
Miscellaneous Works
Item Rate
540 days
Nalco Damanjodi
4 documents required · 4 mandatory
₹0
₹10,000
Yes
5 Jun 2026
7 May 2026
23 May 2026
7 May 2026
22 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.1.2) Removing the excavated materials , debris of any description and other waste materials, spoil including loading into trucks/tractors using baskets by head loads or any other means and transporting by trucks/ tractors up to a distance of 1 km and unloading at the ear marked places inside plant, spreading levelling complete as directed by Engineer-in-charge. | 200 | Cum | - | - |
| 2 | 2.8.0) Earth work in all kinds of soil in foundation, trenches or drains not exceeding 1.5m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus earth as directed within a lead of 50 M. Disposed soil to be levelled and neatly dressed. | - | - | - | - |
| 3 | 2.8.1) Same as item (02.08.00) above but in lift upto 1.5 m in all type of soil. | 150 | Cum. | - | - |
| 4 | 15.7) Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | - | - | - | - |
| 5 | 15.7.4) In cement mortar | 70 | Cum | - | - |
| 6 | 15.58) Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to alead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. | 10 | Cum | - | - |
| 7 | 02.25.00 ) Back filling with selected excavated earth or any other materials around the foundations, under floors, pavements or any other places in layers not exceeding 20 cm, watering and ramming, consolidating etc. complete lead upto 50m & lift upto 1.5m . | 100 | Cum | - | - |
| 8 | 04.01.00) Providing and laying plain cement concrete at all depths below and upto ground level in foundations,fillings,non-suspended floors including tamping, curing etc. but excluding the cost of centering and shuttering etc. as specified or directed in any shape, position, thickness and finishing the top surface rough or smooth etc.all complete(CEMENT WILL BE ISSUED FREE OF COST AT NALCO'S STORE.) | - | - | - | - |
| 9 | 04.01.03) P.C.C 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 10 | Cum | - | - |
| 10 | 04.01.08) P.C.C.1:4:8 (1 cement:4coarse sand:8 graded stone aggregate of 40 mm nominal size) | 10 | Cum. | - | - |
stage.html
html • 0.05 MB
finance_954214.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_3.pdf
PDF • 0.15 MB
Tendernotice_4.pdf
PDF • 0.69 MB
BOQ_954214.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].