| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | ₹4.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 L+₹22,372.33 (4.74%)Rejected-AOC | ₹4.9 L+₹22,372.33 (4.74%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Shubham Associates L1 | J P INFRATECH L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning Thick Bushes & Throny Jungle without uprooting jhunds including all cost of labour and T&P etc.Complete. | 6,375 | Sqm | 4.11 ₹26,201.25 | 4 ₹25,500 Lowest |
| 2.00 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 110 | Nos | 32.73 ₹3,600.3 Lowest | 34 ₹3,740 |
| 3.00 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. | 8.15 | Cum | 93.5 ₹762.03 Lowest | 98 ₹798.7 |
| 4.00 | Providing and Laying R.C.C 1:1.5:3 (M-25) including all cost of material, labour and T&P etc. | 7.3 | Cum | 6,431.87 ₹46,952.65 Lowest | 6,870 ₹50,151 |
| 5.00 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material labour and T&P etc. | 140.45 | Sqm | 752.68 ₹1,05,713.91 Lowest | 800 ₹1,12,360 |
| 6.00 | Supplying & fixing Steel Rainforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding cutting and placing in position including all cost of material, labour and T&P etc. | 1.57 | MT | 68,409.28 ₹1,07,402.57 Lowest | 70,000 ₹1,09,900 |
| 7.00 | Ready made coloured cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. | 140.43 | Sqm | 71.06 ₹9,978.96 Lowest | 75 ₹10,532.25 |
| 8.00 | Providing and Fixing of Steel work welded in built up sections/ framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | 304.1 | Kg | 126.23 ₹38,386.54 Lowest | 134 ₹40,749.4 |
| 9.00 | Painting on railing by applying one coat of Redoxide zinc chromate primer and two coat of High Gloss Synthetic enamel paint of standred quality after proper cleaning, scraping, preparing the surface i/c all cost of material, labour and T&P as required for proper complete of work. | 19.8 | Sqm | 129.97 ₹2,573.41 Lowest | 135 ₹2,673 |
| 10.00 | Fencing with Angle Iron post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. | 7,320 | Rm | 17.77 ₹1,30,076.4 Lowest | 18.8 ₹1,37,616 |
Tender Value
₹5.0 L
EMD Value
₹11,000
Closing Date
4 Jul 2026, 2:00 pmClosed
EE N.D.G.C, Roorkee
Office of the E.E, N.D.G.C, Roorkee
Construction of a boundary wall on the left bank of the UGC km 25.800 (Khasra No. 335 and 337)under the project to construct boundary walls for safeguarding valuable State Gov. assets at various locations within the jurisdiction of the NDGC,RKE
2026_UPIDC_1164238_8
01/EE/2026-27
Open Tender
Civil Works
Item Rate
120 days
ROORKEE HARIDWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹11,000
23 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
4 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning Thick Bushes & Throny Jungle without uprooting jhunds including all cost of labour and T&P etc.Complete. | 6,375 | Sqm | - | - |
| 2 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 110 | Nos | - | - |
| 3 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. | 8.15 | Cum | - | - |
| 4 | Providing and Laying R.C.C 1:1.5:3 (M-25) including all cost of material, labour and T&P etc. | 7.3 | Cum | - | - |
| 5 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material labour and T&P etc. | 140.45 | Sqm | - | - |
| 6 | Supplying & fixing Steel Rainforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding cutting and placing in position including all cost of material, labour and T&P etc. | 1.57 | MT | - | - |
| 7 | Ready made coloured cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. | 140.43 | Sqm | - | - |
| 8 | Providing and Fixing of Steel work welded in built up sections/ framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | 304.1 | Kg | - | - |
| 9 | Painting on railing by applying one coat of Redoxide zinc chromate primer and two coat of High Gloss Synthetic enamel paint of standred quality after proper cleaning, scraping, preparing the surface i/c all cost of material, labour and T&P as required for proper complete of work. | 19.8 | Sqm | - | - |
| 10 | Fencing with Angle Iron post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. | 7,320 | Rm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.60 MB
BOQ_2182913.xls
BOQ • 0.29 MB
FinalBOOKLATE.pdf
Tender Documents • 16.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .