Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.4 LAdmitted-Finance UTTAR PRADESH UP | -22.00% | ₹18.4 L | L1 | Admitted-Finance |
| 2 | L2₹18.7 L+₹35,075.20 (1.91%)Admitted-Finance | -20.51% | ₹18.7 L+₹35,075.20 (1.91%) | L2 | Admitted-Finance |
| 3 | L3₹20.0 L+₹1.6 L (8.97%)Admitted-Finance | -15.00% | ₹20.0 L+₹1.6 L (8.97%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
20 Jun 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Ramchandra paramhansh ward me cc sadak wa nali nirman karya As per NIT 17
2026_DOLBU_1151201_17
153/NNA/Single/2026
Open Tender
Civil Works
Percentage
60 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,350
MC
₹2.4 L
16 Jul 2026
21 May 2026
20 Jun 2026
21 May 2026
20 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in excavation in ordinary soil etc all complete St. No. 251 | 86.64 | Cum | 125 | ₹10,830 |
| 2 | P/LP.C.C. work in 1:6:12 with.cement, F/sand and 40mmn brick ballast etc all complete Work SI No 273 | 14.44 | Cum | 3,950 | ₹57,038 |
| 3 | Class 150 brick work in 1:4 C.sand all complete. SI No 305b | 36.02 | Cum | 5,390 | ₹1,94,147.8 |
| 4 | 12mm thick Cement plaster in 1:3 all complete. | 106.4 | Sqm | 190 | ₹20,216 |
| 5 | Supply & Laying of 22.4-53mm S/G WBM3 ali complete work. | 99.56 | Cum | 3,866 | ₹3,84,898.96 |
| 6 | S/L of 125 micron Polythene sheet all complete. | 995.6 | Sqm | 25 | ₹24,890 |
| 7 | M-20 Grade Ready mix cement concrete with admixture 125 micronl Ploythine Shheet all complete. | 119.47 | cum | 9,070 | ₹10,83,592.9 |
| 8 | Additional for Non Matallic CC Surface Hardner I/C all comp. | 995.6 | sqm | 96 | ₹95,577.6 |
| 9 | P/L of C.C. 1:2:4 all complete. S.1. No 279b | 7.22 | Cum | 7,850 | ₹56,677 |
| 10 | R.C.C. 1:15:3 in slab cement C.Sand and Stone grit etc. | 17.32 | Cum | 8,650 | ₹1,49,818 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_2157289.xls
BOQ • 0.29 MB
1Corrigendum.pdf
PDF • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .