| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹3.7 L (3.46%)Rejected-Finance | ₹1.1 Cr+₹3.7 L (3.46%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFY WITH TECHNICAL SPECIFICATIONS |
| 4 | Rejected-Technical UTTAR PRADESH UP | GHAZIPUR | UTTAR PRADESH | 232325 | - | - | Rejected-Technical NOT QUALIFY WITH TECHNICAL SPECIFICATIONS |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
19 Feb 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER
O/O SE XITH CIRCLE I.W. AYODHYA
Lot no-08 CONSTRUCTION OF REGULATOR AT KM. 7.150 LEFT AFFLUX BUND LEFT BANK OF SHIMLI (CHAUKA) RIVER IN DISTRICT- BARABNKI.
2024_UPIDC_894589_8
06/XITH/2023-24
Open Tender
Civil Works
Item Rate
120 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,965
₹2.3 L
14 Mar 2024
13 Feb 2024
19 Feb 2024
13 Feb 2024
19 Feb 2024
13 Feb 2024
Amount
Dry earth work in digging foundation in ordinary, soil Including hard clay, bajri upto 5% all lead, lifts labour and T&P ec. Completion of work.
Earth work in making bund from executed digging earth for lead upto 30.00m and lift upto 1.50m including manual compaction and dressing all and T&P etc. complete. Required for proper completion of work.
Earth work In Refilling of trench arround regulator by Digging executed earth with mechanical compaction and dressing in all types of soils including royalty, all leads and lifts. Labour and T&P for proper completion of work.
Laying C.C. 1:3:6 with cement, coarse sand and 20-40 m m crushed stone ballast including all lead, lifts cost of all materials, labour and T&P etc complete required for proper completion of work.
1st class brick in 1:4 cement & coarse sand mortar including all lead, lift, cost of materials. Labour and T&P Etc complete required for proper completion of work.
Centering & shuttering for PCC work including cost of materials, labour and T&P etc including all lead lift,cost of materials, labour and T&p etc. complete required for proper completion of work.
Providing/laying 1200mm dia, 115mm thick, NP3 hume pipe with its carriage up to site of work including all lead ,lift cost of materials, loabour and T&P etc . Complete required for proper completion of work.
Laying P.C.C. 1:2:4 with cement coarse sand and 10-20 mm crushed stone grit including all lead ,lift cost of materials, labour and T&P etc. Complete required for proper completion of work.
S/F 90 mm dia PV C pipe in weep hole & below C C block including all lead, lift, cost of materials, labours and T&P etc. Complete required for proper completion of work.
Providing/Laying Graded Filter
Providing/Laying Graded Filter on weep hole & below C.C. Block including all lead, lift, cost of materials, labour and T&P etc. Complete required for proper completion of work . A-Stone Grit 10- 20 MM .
Providing/Laying Graded Filter on weep hole & below C.C. Block including all lead, lift, cost of materials, labour and T&P etc. Complete required for proper completion of work . B-Pee Gravel .
Providing/Laying Graded Filter on weep hole & below C.C. Block including all lead, lift, cost of materials, labour and T&P etc. Complete required for proper completion of work. C-Coarse Sand.
S/Fabricating/Fixing flap type steel gate in position including cost of all materials, carriage with loading, unloading, painting, labour and T&P etc complete required for proper completion of work.
Stuck cement pointing 1:2 with cement and coarse sand Including all, cost of materials, labour and T&P etc complete required for proper completion of work
Laying c c Block with C.C. 1:3:6 with cement, coarse sand and 20-40 mm crushed stone ballast including Cost of all lead, lifts, cost of all materials, labour and T&P etc. Complete required for proper completion of work.
Providing/Laying Geo textile Sheet made of 200 GSM woven maltifilament polypropelene below Boulder Pitching including all taxes labour materials &T&P
Providing/Pitching Mirzapur stone boulder 20-40 Kg in weight Including all lead, lift, cost of materials, labour and T &P etc complete required for proper completion of work.
Dewatering for foundation Including all lead lift/ cost, of meterial labour and T&P etc complete require for proper complation of work./Job for regulator 4 barrel.
OSHONIC COMPANY
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .