Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹60.0 LAdmitted-Finance NEAR TALAB PALOURA AKHNOOR ROAD JAMMU AKHNOOR ROAD JAMMU PALOURA JAMMU JAMMU KASHMIR 180002 UDYAM JK 07 0023360 | JAMMU | JAMMU AND KASHMIR | 180002 | -24.99% | ₹60.0 L | L1 | Admitted-Finance |
| 2 | L2₹66.5 L+₹6.5 L (10.9%)Admitted-Finance | -16.85% | ₹66.5 L+₹6.5 L (10.9%) | L2 | Admitted-Finance |
| 3 | L3₹74.4 L+₹14.4 L (24.0%)Admitted-Finance | -7.00% | ₹74.4 L+₹14.4 L (24.0%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹80 L
EMD Value
₹1.6 L
Closing Date
20 Aug 2026, 5:00 pmClosed
Executive Engineer PWD RnB Division Katra
Executive Engineer PWD RnB Division Katra
BOQ
2026_PWDJK_319812_2
e-NIT No. 26 of 2026-27 Dt. 06-08-2026
Open Tender
Civil Works
Percentage
30 days
KATRA
NIT
2 documents required · 2 mandatory
₹1,500
Yes
Executive Engineer PWD RnB Division Katra
₹1.6 L
Yes
2 Sept 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material upto a lead of 1 kilometer, as per direction of Engineer-in-charge. | 72 | cum | 336.3 | ₹24,213.6 |
| 2 | Providing and laying tack coat using hot straight run bitumens of grad-VG-30 including heating the bitumen, spraying the bitumens with mechnically operated spray unit fitted on bitumen boiler ,cleaning and preparing the existing road surface as per specifications.On Bitunen surface @0.75 kg/sqm | 2,000 | sqm | 75.75 | ₹1,51,500 |
| 3 | Providing and laying 50 mm thick bituminious macadam ,using crushed stone aggregates of specified grading premixed with bituminous binder ,transported to site by tippers ,laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade. level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density,complete as per specification and direction of Engineer -in- charge 50 to 100 mm average compacted thickness with bitumen of grade VG -30 @3.5%(percentageby weight of total mix) Batch Type Hot Mix Plant of 60-90 TPH capacity. | 100 | cum | 8,734.85 | ₹8,73,485 |
| 4 | Providing and laying tack coat using hot straight run bitumens of grad-VG-30 including heating the bitumen, spraying the bitumens with mechnically operated spray unit fitted on bitumen boiler ,cleaning and preparing the existing road surface as per specifications.On Bitunen surface @0.50 kg/sqm | 9,600 | sqm | 56.1 | ₹5,38,560 |
| 5 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). with paving asphalt grade VG-30 with no solvent. | 9,600 | sqm | 268.15 | ₹25,74,240 |
| 6 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-30 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete | 9,600 | sqm | 102.85 | ₹9,87,360 |
| 7 | Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 570 | sqm | 638.9 | ₹3,64,173 |
| 8 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge. | 498.4 | sqm | 93.4 | ₹46,550.56 |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 73.38 | cum | 5,202.9 | ₹3,81,788.8 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 73.38 | cum | 5,733.6 | ₹4,20,731.57 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_1060399.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .