| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC NO 12B SESHADRIPALAYAM STREET KANCHEEPURAM 631503 | KANCHEEPURAM | KANCHEEPURAM | TAMIL NADU | 631503 | ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹19.6 L (7.73%)Rejected-AOC PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹2.7 Cr+₹19.6 L (7.73%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M S SIVAKUMAR L1 | K S CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing of juliflora jungle including cost of all labour, lead, lift etc. complete. | 750 | m2 | 10 ₹7,500 Lowest | 12 ₹9,000 |
| 2.00 | Earth work excavation for levelling the yard in hard stiff clay,black cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete | 300 | m3 | 250 ₹75,000 Lowest | 270 ₹81,000 |
| 3.00 | Earth work excavation in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete. | 1,590 | m3 | 250 ₹3,97,500 Lowest | 270 ₹4,29,300 |
| 4.00 | Providing sand filling in foundation, including cost of sand, filling charges, watering and consolidation etc complete. | 66 | m3 | 2,200 ₹1,45,200 | 2,000 ₹1,32,000 Lowest |
| 5.00 | Providing foundation concrete in PCC 1:3:6, using 20 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete. | 78 | m3 | 10,000 ₹7,80,000 Lowest | 12,000 ₹9,36,000 |
| 6.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for raft concrete including cost of all materials,curing,labour ,lead,lift etc.complete. | 315 | m3 | 15,000 ₹47,25,000 Lowest | 15,500 ₹48,82,500 |
| 7.00 | PCC 1:2:4 using 12 to 20 mm HBG metal for Footing without form work including cost of all materials,curing,labour ,lead,lift etc.complete.(Below.GL) | 26 | m3 | 10,000 ₹2,60,000 | 9,500 ₹2,47,000 Lowest |
| 8.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work for the reactor plinths and its associated equipment plinth including cost of all materials,curing,labour ,lead,lift etc.complete. | 208 | m3 | 19,000 ₹39,52,000 Lowest | 20,000 ₹41,60,000 |
| 9.00 | PCC 1:2:4 using 12 to 20 mm HBG metal for Footing with form work for reactor plinth and yard light including cost of all materials,curing,labour ,lead,lift etc.complete.(Above.GL) | 21 | m3 | 18,000 ₹3,78,000 Lowest | 20,000 ₹4,20,000 |
| 10.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for Wall concrete for oil sump and reactor plinth with form work including cost of all materials,curing,labour ,lead,lift etc.complete. | 116 | m3 | 21,000 ₹24,36,000 Lowest | 22,500 ₹26,10,000 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
8 Jul 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Providing RCC foundation plinths in 400 kV Bay for erection of 1x125 MVA switchable reactor with associated equipments at Ottiyambakkam 400/230/110 kV Substation in Operation Chennai South Circle
2025_EB_574683_1
TP1-42/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
OTTIYAMBAKKAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.8 L
Yes
29 Nov 2025
27 Jun 2025
9 Jul 2025
27 Jun 2025
8 Jul 2025
27 Jun 2025
Amount
Clearing of juliflora jungle including cost of all labour, lead, lift etc. complete.
Earth work excavation for levelling the yard in hard stiff clay,black cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete
Earth work excavation in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete.
Providing sand filling in foundation, including cost of sand, filling charges, watering and consolidation etc complete.
Providing foundation concrete in PCC 1:3:6, using 20 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete.
RCC 1:1.5:3 using 12 to 20 mm HBG metal for raft concrete including cost of all materials,curing,labour ,lead,lift etc.complete.
PCC 1:2:4 using 12 to 20 mm HBG metal for Footing without form work including cost of all materials,curing,labour ,lead,lift etc.complete.(Below.GL)
RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work for the reactor plinths and its associated equipment plinth including cost of all materials,curing,labour ,lead,lift etc.complete.
PCC 1:2:4 using 12 to 20 mm HBG metal for Footing with form work for reactor plinth and yard light including cost of all materials,curing,labour ,lead,lift etc.complete.(Above.GL)
RCC 1:1.5:3 using 12 to 20 mm HBG metal for Wall concrete for oil sump and reactor plinth with form work including cost of all materials,curing,labour ,lead,lift etc.complete.
RCC 1:1.5:3 for RCC Cover slabs for oil sump and cable duct using 12 to 20 mm HBG metal for including cost of all materials,curing,labour ,lead,lift etc.complete.
Supplying fabricating and placing in position of steel reinforcements including cost of steel binding wire labour for cutting bending tying placing in correct position transport lead lift etc complete as per standard specification.
Supply and assembling template for switch WC columns and CT support structure including cost of all labour lead and lift etc complete . as directed by the dept. Engineer at site.
Supplying and fixing approved MS Rails (105 LBS) including cost of all labour lead and lift etc complete . as directed by the dept. Engineer at site
Supplying and fixing 24mm dia GI foundation bolt of 0.75 length, with 10cm thread at top and 15cm ‘L’at bottom cost of materials, fabrication, with hot dip galvanising etc. Complete as per standard specification.
Supplying fabrication in 50 x 50 x 6, GI angle as per drawing and standard specification for cable duct including cost of all materials, labour, lead, lift, etc. Complete as per standard specification.
Supplying , fabrication base plate in Transformer plinths and supports including cost of all materials, labour, lead, lift, etc. Complete
Supplying and laying PVC pipe 10 Kg/Cm2 of approved quality and best make (Finolex or Equivalent) including fixing PVC pipe specials,elbow,tee and nipples with hole etc., including the cost of excavation,sand filling arround pipe,refilling and all also, lobour ,lead, lift, T&P, etc ,complete.for PVC Pipe 20mm dia
Supplying and laying PVC pipe 10 Kg/Cm2 of approved quality and best make (Finolex or Equivalent) including fixing PVC pipe specials,elbow,tee and nipples with hole etc., including the cost of excavation,sand filling arround pipe,refilling and all also, lobour ,lead, lift, T&P, etc ,complete.for PVC Pipe 25mm dia
Supplying and fixing in position of 20 mm dia PVC dummy (400KV Side) of approved make and quality conforming to is specification including the cost of all materials,lobour,lead,lift,etc., complete.
Supplying and filling with rubble soiling with voids filled with murrom/ sand for RCC Cum road including the cost of all materials,lobour,lead,lift,etc., complete.
Supplying and filling with 40mm HBG Metal around and inside transformer plinths including the cost of all materials,lobour,lead,lift,etc., complete.
Supplying and filling with quarry dust inside the Yard area including cost of all materials, labour,lead, lift,etc., complete as directed by engingeer incharge at site.
Supplying and spreading with 20mm HBG matal inside the Yard area including cost of all materials, labour,lead, lift,etc., complete as directed by engineer incharge at site
supplying and spreading of well gravel for low lying area including cost of well gravel labour for consolidation lead lift etc.complete
Plastering in c.m. 1:3, 12 mm thick for all exposed faces of concrete and brick works including cost of cement, all materials, lead, lift etc. complete.
Colour washing with two coats over a priming coat including cost of all materials with colour pegments, labour, lead, lift, etc complete
Removal of surplus earth from the site and putting into low lying area outside the yard
Dismantling of RR Masonry with all labour, lead, lift etc complete.
Dismantling of PCC with all labour, lead, lift etc complete.
Dismantling of RCC with all labour, lead, lift etc complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K S CONSTRUCTION (BID ID -1394440)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .