Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 LAdmitted-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 UDYAM UP 43 0021665 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹3.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUSAIRAJ S L1 | Krishna and Co L2 |
|---|---|---|---|---|---|
| 1.01 | 1.Renivation of Anaikudam PUM School Building in Anaikudam Panchayat (South Facing)
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 32.93 | Sqm | 9 ₹296.37 | 10 ₹329.30 |
| 1.02 | Chipping of concrete and roughening the surface including all labour charges, etc., copmlete | 32.93 | Sqm | 40 ₹1,317.20 | 45 ₹1,481.85 |
| 1.03 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 32.93 | Sqm | 308.8 ₹10,168.78 | 315 ₹10,372.95 |
| 1.04 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 32.93 | Sqm | 163 ₹5,367.59 | 170 ₹5,598.10 |
| 1.05 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete | 35.32 | Sqm | 39.3 ₹1,388.08 | 42 ₹1,483.44 |
| 1.06 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 53.33 | Sqm | 150.4 ₹8,020.83 | 155 ₹8,266.15 |
| 1.07 | Re-Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 87.24 | Sqm | 267.4 ₹23,327.98 | 270 ₹23,554.80 |
| 1.08 | Re-Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer. | 10.08 | Sqm | 177.2 ₹1,786.18 | 180 ₹1,814.40 |
| 2.01 | 2.Renovation of Edanganni PUM School Building in Edanganni Panchayat
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 51.73 | Sqm | 9 ₹465.57 | 12 ₹620.76 |
| 2.02 | Chipping of concrete and roughening the surface including all labour charges, etc., copmlete | 51.73 | Sqm | 40 ₹2,069.20 | 41 ₹2,120.93 |
Tender Value
₹3.4 L
EMD Value
₹4,000
Closing Date
5 Dec 2025, 3:00 pmClosed
Block Development Officer (BP)
Panchayat Union, T.Palur
Renovation of School Buildings 4 Nos in Anaikudam, Edanganni, T.Palur and Valaikurichi Panchayats in Package No.1 in T.Palur Block of Ariyalur District under PUGF 2025-26
2025_RDTN_628746_1
A3/3913/2025,Dated.28.11.2025
Open Tender
Civil Works - Others
30 days
Panchayat Union, T.Palur
As per Tender Document
4 documents required · 4 mandatory
₹0
₹4,000
8 Dec 2025
4 Dec 2025
5 Dec 2025
4 Dec 2025
5 Dec 2025
4 Dec 2025
Amount
1.Renivation of Anaikudam PUM School Building in Anaikudam Panchayat (South Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Chipping of concrete and roughening the surface including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re-Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Re-Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
2.Renovation of Edanganni PUM School Building in Edanganni Panchayat Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Chipping of concrete and roughening the surface including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re-Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Re-Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Painting two coats with approved Black Oxide for Old Black board, the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
3.Renovation of Thathampettai PUM School Building in T.Palur Panchayat Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers.
4.Renovation of Mathanathur PUM School Building in Valaikurichi Panchayat Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Chipping of concrete and roughening the surface including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
Krishna and Co (BID ID -1526602)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.13 MB
TechnicalBid1.pdf
Tender Documents • 0.83 MB
PriceBid1.pdf
Tender Documents • 0.71 MB
BOQ_751878.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid