Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹9.2 L+₹4,698.06 (0.51%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | N ALAGU SANKARA NARAYANAN L1 | OM SARAVANABHAVA BUILDERS L2 |
|---|---|---|---|---|---|
| 1.01 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Mosaic in situ finish in cement mortar in flooring and in wall surface | 34.07 | M2 | 69.7 ₹2,374.68 Lowest | 70.1 ₹2,388.31 |
| 1.02 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / stone masonry in Cement mortar walls under 3m high | 2.17 | M3 | 311.9 ₹676.82 Lowest | 313.5 ₹680.3 |
| 1.03 | Clean removal of Cement plaster from walls | 13.07 | M2 | 9.3 ₹121.55 Lowest | 9.4 ₹122.86 |
| 2.00Brick work in Cement Mortar 1:5 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 2.01 | In First floor | 3.3 | M3 | 7,691.3 ₹25,381.29 Lowest | 7,730.6 ₹25,510.98 |
| 3.00Brick partition walls of 11.50cm thickness using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 3.01 | In First floor | 17.37 | M2 | 1,016.7 ₹17,660.08 Lowest | 1,021.9 ₹17,750.4 |
| 4.00 | Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | 17.5 | M2 | 306.8 ₹5,369 Lowest | 308.4 ₹5,397 |
| 5.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 5.05 | M2 | 1,121 ₹5,661.05 Lowest | 1,126.7 ₹5,689.84 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 0.6 | Qtl | 9,696.7 ₹5,818.02 Lowest | 9,746.1 ₹5,847.66 |
Tender Value
₹9.4 L
EMD Value
₹9,380
Closing Date
6 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, PWD., Buildings (C and M) Division, Tirunelveli
Special repairs to Joineries, Flooring, Aluminium Partition arrangements to First floor OT area in Main block in Tirunelveli Medical College Hospital at Tirunelveli
2026_PWD_717050_1
10 (8) EE/2026-27 dated.22.10.2026
Open Tender
Civil Works - Buildings
Lump-sum
90 days
Tirunelveli medical college hospital
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,380
10 Nov 2026
23 Oct 2026
10 Nov 2026
23 Oct 2026
6 Nov 2026
23 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Mosaic in situ finish in cement mortar in flooring and in wall surface | 34.07 | M2 | 71.06 | ₹2,421.01 |
| 1.02 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / stone masonry in Cement mortar walls under 3m high | 2.17 | M3 | 318.11 | ₹690.3 |
| 1.03 | Clean removal of Cement plaster from walls | 13.07 | M2 | 9.51 | ₹124.3 |
| 2Brick work in Cement Mortar 1:5 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 2.01 | In First floor | 3.3 | M3 | 7,844.32 | ₹25,886.26 |
| 3Brick partition walls of 11.50cm thickness using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 3.01 | In First floor | 17.37 | M2 | 1,036.94 | ₹18,011.65 |
| 4 | Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | 17.5 | M2 | 312.91 | ₹5,475.93 |
| 5 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 5.05 | M2 | 1,143.32 | ₹5,773.77 |
| 6 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 0.6 | Qtl | 9,889.45 | ₹5,933.67 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
Tendercondition8.pdf
Tender Documents • 0.97 MB
BOQ_861298.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .