Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹48.7 Cr+₹3.4 Cr (7.48%)Admitted-Finance BEHIND DUDI DHARAM KANTA BIKANER | BIKANER | BIKANER | RAJASTHAN | 334001 | L2 | Admitted-Finance | ||
| 3 | L3₹52.4 Cr+₹7.1 Cr (15.6%)Admitted-Finance AA CLASS PWD CONTRACTOR NEAR NEW SABJI MANDI BEHIND DHARM KANTA PUGAL ROAD BIKANER | BIKANER | BIKANER | RAJASTHAN | L3 | Admitted-Finance |
Tender Value
₹51.8 Cr
EMD Value
₹1.0 Cr
Closing Date
19 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE PWD Zone Bikaner
ACE PWD Zone Bikaner
Widening and Strengthening work from Ranjeetpura-Osian (SH-87A) Km 41/0 to 50/0, 53/0 to 56/0, 77/0 to 81/0, 122/0 to 173/0 and 190/500 to 205/500
2022_CEPWD_269312_3
NIT No. 02/2022-23 of ACE PWD Zone Bikaner
Open Tender
Civil Works - Roads
Percentage
365 days
Bikaner
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Through Online Egrass Challan Dn. ID 28429
₹1.0 Cr
Yes
ACE PWD Zone Bikaner
27 May 2022
19 Apr 2022
20 May 2022
19 Apr 2022
19 May 2022
20 Apr 2022
19 Apr 2022 - 19 May 2022
20 Apr 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A- EARTH WORK | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means.In area of thorny jungle | 1 | Hect | 15,448 | ₹15,432.55 |
| 3 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | - | Cum | 25 | - |
| 4 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | - | Cum | 32 | - |
| 5 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 Note :- Deduct if excavated earth as per item No. 3.5
(ii) is used and pushed for filling in embankment. | - | Cum | 31 | - |
| 6 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 50 m as per MoRD Specification Clause 301.5 | 1 | Cum | 58 | ₹57.94 |
| 7 | Milling of distressed bituminous layer upto 70mm depth in a single pass with suitable milling machine (capable of milling @ 200&300 sqm of area per hr) fitted with loading conveyer of loading the filled material directly on the trucks i/c hauling and stock billing the reclaiming to bring to required specification to reuse with the approval of engineer-in-charge for safe disposal with all leads and lifts complete in all respect as directly by Engineer-in-charge.
Note: The unutilized quality of reclaimed bituminous mix material shall be recovered. | - | Cum | 535 | - |
| 8 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | - | Cum | 893 | - |
| 9 | PART- B:- GSB & WMM WORK | - | - | - | - |
| 10 | Construction of granular sub-base by providing well graded material, spreading in uniform layers on prepared surface, mixing by manual mean method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.Material.For Grading III Material | - | Cum | 368 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.20 MB
Tendernotice_2.pdf
PDF • 8.45 MB
Tendernotice_3.pdf
PDF • 14.67 MB
Tendernotice_4.pdf
PDF • 0.14 MB
PostQuaBidSHW87A01.pdf
Tender Documents • 0.36 MB
BOQ_480208.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .