| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-Finance 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 1 | Accepted-Finance satisfied | |
| 2 | 2₹11.6 L+₹1.6 L (16.4%)Accepted-Finance 39 39 THANGAMAPURI PATTINAM METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | 2 | Accepted-Finance satisfied |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
13 Feb 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE / MTPS-I
Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP I Replacement of existing heavily damaged worn out drive bed frame structures with bed foundation in Wagon Tippler I
2025_EB_521790_1
CE SE M II MTPS I CHP I OT 45 2024 2025
Open Tender
Miscellaneous Works
Works
30 days
MTPS-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹13,000
Yes
20 Feb 2025
30 Jan 2025
14 Feb 2025
30 Jan 2025
13 Feb 2025
30 Jan 2025
Amount
Charges for supporting the structure in front and rear side of Wagon Tippler at drive and non drive end frames by using ISMB 450 X 150 mm, 350 x 140mm, 200 X 100mm channels, angles and packing of wooden sleepers to avoid swing of tippler platform and making stability and safety arrangements and after attending all works, dismantling of supporting arrangements after completion of work.
Charges for removal of top cover, bottom cover, single piece pillow block, cleaning of split spur wheel, and removal of split spur wheel from the drive shaft by splitting the two halves of the split spur wheel and lifting them to the Wagon Tippler floor from main shaft drive pit.
Charges for removal of drive shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor.
Charges for removal of Plummer block (near pinion) top & bottom fixing bolts & nuts, removing of rigid coupling bolts, removal of intermediate shaft near the drive shaft from the other intermediate shaft and dismantling the drive shaft.
Charges for removal and refixing of final pinion shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor
Charges for removing the existing damaged Foundations and Bed Bolts in the top surface of the bed by using Power Jack Hammer. After erection of bed bolt alignment checking, fixing the cross rod in the bed bolts and applying the Nitobond to the surface area of the existing concrete and cement ( Quick setting cement Con bextra GP2 ) plastering and surface finishing then curing the area.
Charges for fabrication of new bed frame assembly as per existing bed frame size for Wagon Tippler main drive shaft, intermediate shaft and final pinion shaft by using 20mm thick MS plates cutting, marking, edge grinding, setting & welding & drilling of bottom & top plate of bed frame.
Charges for mounting / reerect of split spur wheel in the drive shaft and checking the operation of the Wagon Tippler after completion of all works.
Charges for re-erect the intermediate shaft after positioning drive shaft, final pinion shaft and refixing the coupling, (other end) plummer blocks and rack segment – 4 Nos. and related assemblies, greasing and tightening all plummer blocks top and bottom halves, fixing bolts and tightening all rigid coupling bolts after putting HSFG bolts.
Charges for alignment of the Wagon Tippler such as (1) Pinion and split spur wheel (2) Rack and pinion (3) Pawl and pawl lever arrangement (4) pivot shafts alignment with pedestal for operation of Wagon tippler and trail run etc.
Charges for supply of M30 foundation bolt with 2 nuts & washers
Charges for supply of MS plate 20 mm thick
Charges for consumables such as cotton waste, Anti corrosive paint etc, and T&P's spanner set hammers, sprit level etc, Sl.No. 1 to 10
Supply of MS Welding Electrode for Sl.No.7
Charges for cutting gas for Sl.No.1,3,4, 5 & 7
BHARATH ENGINEERING WORKS (BID ID -1249760)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .