| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.4 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹42.0 Cr+₹1.6 Cr (4.01%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹42.2 Cr+₹1.8 Cr (4.38%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹42.2 Cr+₹1.8 Cr (4.43%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹42.9 Cr+₹2.5 Cr (6.30%)Admitted-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | L5 | Admitted-Finance |
Tender Value
₹45.4 Cr
EMD Value
₹90.7 L
Closing Date
1 Jul 2025, 3:00 pmClosed
Commissioner
Municipal Council Kishangarh
Construction of Outdoor Stadium at Kishangarh, Ajmer
2025_DLB_476228_1
06/2025-2026/Vikas
Open Tender
Civil Works
Percentage
Kishangarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Commissioner
₹90.7 L
Yes
6 Sept 2025
6 Jun 2025
3 Jul 2025
6 Jun 2025
1 Jul 2025
6 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In hard rock (required blasting) including Blasting materials. Depth upto 1.5 m | 14,755.41 | Cum | 2,493 | ₹3,67,85,237.13 |
| 2 | Add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 4.10.1.1 | 32.97 | Cum | 484.66 | ₹15,979.24 |
| 3 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. 80% of total excavated soil | 4,514.12 | Cum | 159 | ₹7,17,744.44 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 2,999.88 | Cum | 4,575 | ₹1,37,24,451 |
| 5 | 1:3:6 (1 Cement : 3 fine/ coarse sand : 6 graded stone aggregate 40 mm nominal size). | 127.8 | Cum | 4,885 | ₹6,24,303 |
| 6 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.47 | Cum | 5,510 | ₹13,609.7 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 4,421.59 | Sqm | 236.5 | ₹10,45,706.04 |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 10,189.67 | Sqm | 426 | ₹43,40,799.42 |
| 9 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 3,815.08 | Sqm | 367 | ₹14,00,134.36 |
| 10 | Suspended floors, roofs, landings, balconies and access platform. | 11,743.9 | Sqm | 456 | ₹53,55,218.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.74 MB
Tenderdocument.pdf
Tender Documents • 0.88 MB
Tenderdocument_2.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .