| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹3.4 L (1.10%)Admitted-Finance | ₹3.1 Cr+₹3.4 L (1.10%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹7.4 L (2.43%)Admitted-Finance | ₹3.1 Cr+₹7.4 L (2.43%) | L3 | Admitted-Finance |
| 4 | L4₹3.5 Cr+₹48.1 L (15.7%)Admitted-Finance N A | NA | NA | 121004 | ₹3.5 Cr+₹48.1 L (15.7%) | L4 | Admitted-Finance |
| 5 | L5₹5.4 Cr+₹2.3 Cr (76.2%)Admitted-Finance | ₹5.4 Cr+₹2.3 Cr (76.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aakar Infra Engineers PVT Ltd L4 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L3 | Ms Gangadhar Jena L1 | M/S BHAIRAB CHARAN SWAIN L2 | AEC ENGINEERS PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing R.C.C. columns, beams, slab etc. including stacking the useful materials for reuse and removing the debris within all lead & lifts with supply of all labour, T&P, staging, scaffolding, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge. | 534.75 | Each Cum | 1,250 ₹6,68,437.5 | 1,200 ₹6,41,700 | 800 ₹4,27,800 Lowest | 900 ₹4,81,275 | 4,500 ₹24,06,375 |
| 2.00 | Construction of dry lean cement concrete subbase over a preapred subgrade with coarse and fine aggregate confirming to IS:383, the size of coarse aggregate not exceeding 25mm., aggregate cement ration not to exceed 15:1, aggregate gradation after blending to be as per table 600.1, cement content not to be less than 150Kg./Cum., optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10MPA at 7 days, mixed in a batching plant, transported to site, laid and compacting with vibratory roller 8 to 10 ton capacity , finshing and curing as per clause 601 of MoSRT&H specification for road & bridge works (4th revision) with supply of all labour, T&P, materials, taxes, tollage, all transportation charges, enggement, hire & running charges of all machineries, Port entry fees etc. all complete excluding GST and as per diretion of Engineer in charge. | 1,137.75 | Each Cum | 4,800 ₹54,61,200 | 2,700 ₹30,71,925 | 2,500 ₹28,44,375 Lowest | 3,700 ₹42,09,675 | 7,500 ₹85,33,125 |
| 3.00 | Cement concrete of M-30 grade of PQC by using Crusher broken hard granite chips of 12mm to 20 mm size of approved quality for RCC road work, mixing in a Batching plant, transporting the concrete by any approved means, hoisting, laying on road pavement slabs in panels of required size, providing thermocol at top 50 mm of the panel joints so as to create a gap of 12mm between panels, compacting by mechanical vibrator with 60mm needle vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding, barricading the area for proper safety of the fresh concrete without obstructing the traffic, etc with supply of all materials, labour, T&P, tollage, all transportation charges, engagement, hire & running charges of all machineries, taxes excluding GST and excluding cost of formwork, cost of joints, cost of steel & labour charges for bending & binding of steel etc all complete as directed by Engineer in Charge.
N.B: 1) Two separate Mix Design shall be conducted with different Cement brand for RCC work & Barricading the site if required.
2) material testing cost borne by contractor. | 3,227.85 | Each Cum | 7,500 ₹2,42,08,875 | 5,980.7 ₹1,93,04,802.5 | 5,950 ₹1,92,05,707.5 | 5,495 ₹1,77,37,035.75 Lowest | 8,500 ₹2,74,36,725 |
| 4.00 | Supplying the chemical of synthetic rubber emulsion adhessive (fully soluble in water) of approved make (for bonding between old and new concrete), preparation of boding mortar (pasty mortar) with water and chemical ratio 1:8 (by volume), applying it on the thoroughly cleaned old concrete surface of 25mm thickness, spreading uniformly over the surface prior to pouring fresh concrete for bonding between successive concrete cassing with supply of all materials, labour, T&P, water (PH value-7), tollage, royalties, cess, Port entry fees, hire & running charges of all machineries etc. all complete excluding GST and as directed by Engineer in charge. | 2,905 | Each Sqm | 100 ₹2,90,500 | 70 ₹2,03,350 Lowest | 70 ₹2,03,350 Lowest | 110 ₹3,19,550 | 850 ₹24,69,250 |
| 5.00 | Drilling holes for fixing reinforcement bars of required diameter by rotary drills or any approved method, cleaning the holes by blow out pump and with round brushes, grouting the reinforcement bars with suitable anchoring adhesive bars with suitable anchoring adhesive resins of HILTIMAKE HIT–HY 150 or equivalent resins, transporting hoisting, placing & proper fixing of reinforcement bars with cost & expenses of all materials, tools & plants, machineries taxes, tollage including providing barricades to the working area, port entry fees etc. complete excluding GST and as per direction of Engineer in charge (excluding cost of Steel).
Drilling 12 mm dia hole to a depth of 250 mm. | 1,100 | Eacn No. | 30 ₹33,000 Lowest | 400 ₹4,40,000 | 250 ₹2,75,000 | 50 ₹55,000 | 450 ₹4,95,000 |
| 6.00 | Supply of TMT steel manufactured by SAIL/TATA TISCON/VIGAG Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge.
NB: No payment shall be made for extra weight than theoretical co-efficient. | 354.85 | Each Qntl | 10,000 ₹35,48,500 | 7,500 ₹26,61,375 | 8,200 ₹29,09,770 | 6,800 ₹24,12,980 Lowest | 7,549 ₹26,78,762.65 |
| 7.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge. | ||||||||
| 7.01 | RCC foundation and footing base. | 915.6 | Each Sqm | 400 ₹3,66,240 | 120 ₹1,09,872 | 110 ₹1,00,716 Lowest | 110 ₹1,00,716 Lowest | 950 ₹8,69,820 |
| 8.00 | Supplying and laying 125 Micron polythene separation membrane with overlapping of 300 mm at joints including cleaning the surface before placing the membrane etc., complete including cost of all materials, labour, T&P, tollage, taxes excluding GSTetc, all complete as directed by the Engineer In Chrage.
N.B. : No payment will be made for overlapping. | 7,585 | Each Sqm | 60 ₹4,55,100 | 6 ₹45,510 Lowest | 20 ₹1,51,700 | 20 ₹1,51,700 | 55 ₹4,17,175 |
| 9.00 | Supplying & forming 12mm wide x 85mm deep longitudional joints by fixing 12 mm dia 640mm long HYSD bars @ 450mm C/C painted 50mm at center with anti-corrosive paint including providing & fixing bitumen paper, painting one side of concrete surface (250mm thick) with bituminous black paint, cutting grooves of required size and sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials, reinforcement, T&P, labour, Hire and running charges of all machineries, safety measures, taxes excluding GST etc., all complete as directed by Engineer-In-Charge. | 3,052 | Each Running Meter | 15 ₹45,780 Lowest | 200 ₹6,10,400 | 150 ₹4,57,800 | 150 ₹4,57,800 | 450 ₹13,73,400 |
Tender Value
₹3.3 Cr
EMD Value
₹6.7 L
Closing Date
31 May 2022, 5:15 pmClosed
G D SETHY,EE,HWD-1,PPA
G D SETHY,EE,HWD-1,PPA
Improvement to existing entire MPB backup area
2022_MoS_687926_1
CE/HWDI/ACCTS-25/21/212
Open Tender
Civil Works
Works
150 days
Paradip
Refer Tender Document and e-TCN
4 documents required · 4 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹6.7 L
Yes
16 Aug 2022
9 May 2022
1 Jun 2022
9 May 2022
31 May 2022
9 May 2022
Amount
Dismantling and removing R.C.C. columns, beams, slab etc. including stacking the useful materials for reuse and removing the debris within all lead & lifts with supply of all labour, T&P, staging, scaffolding, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge.
Construction of dry lean cement concrete subbase over a preapred subgrade with coarse and fine aggregate confirming to IS:383, the size of coarse aggregate not exceeding 25mm., aggregate cement ration not to exceed 15:1, aggregate gradation after blending to be as per table 600.1, cement content not to be less than 150Kg./Cum., optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10MPA at 7 days, mixed in a batching plant, transported to site, laid and compacting with vibratory roller 8 to 10 ton capacity , finshing and curing as per clause 601 of MoSRT&H specification for road & bridge works (4th revision) with supply of all labour, T&P, materials, taxes, tollage, all transportation charges, enggement, hire & running charges of all machineries, Port entry fees etc. all complete excluding GST and as per diretion of Engineer in charge.
Cement concrete of M-30 grade of PQC by using Crusher broken hard granite chips of 12mm to 20 mm size of approved quality for RCC road work, mixing in a Batching plant, transporting the concrete by any approved means, hoisting, laying on road pavement slabs in panels of required size, providing thermocol at top 50 mm of the panel joints so as to create a gap of 12mm between panels, compacting by mechanical vibrator with 60mm needle vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding, barricading the area for proper safety of the fresh concrete without obstructing the traffic, etc with supply of all materials, labour, T&P, tollage, all transportation charges, engagement, hire & running charges of all machineries, taxes excluding GST and excluding cost of formwork, cost of joints, cost of steel & labour charges for bending & binding of steel etc all complete as directed by Engineer in Charge. N.B: 1) Two separate Mix Design shall be conducted with different Cement brand for RCC work & Barricading the site if required. 2) material testing cost borne by contractor.
Supplying the chemical of synthetic rubber emulsion adhessive (fully soluble in water) of approved make (for bonding between old and new concrete), preparation of boding mortar (pasty mortar) with water and chemical ratio 1:8 (by volume), applying it on the thoroughly cleaned old concrete surface of 25mm thickness, spreading uniformly over the surface prior to pouring fresh concrete for bonding between successive concrete cassing with supply of all materials, labour, T&P, water (PH value-7), tollage, royalties, cess, Port entry fees, hire & running charges of all machineries etc. all complete excluding GST and as directed by Engineer in charge.
Drilling holes for fixing reinforcement bars of required diameter by rotary drills or any approved method, cleaning the holes by blow out pump and with round brushes, grouting the reinforcement bars with suitable anchoring adhesive bars with suitable anchoring adhesive resins of HILTIMAKE HIT–HY 150 or equivalent resins, transporting hoisting, placing & proper fixing of reinforcement bars with cost & expenses of all materials, tools & plants, machineries taxes, tollage including providing barricades to the working area, port entry fees etc. complete excluding GST and as per direction of Engineer in charge (excluding cost of Steel). Drilling 12 mm dia hole to a depth of 250 mm.
Supply of TMT steel manufactured by SAIL/TATA TISCON/VIGAG Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge.
RCC foundation and footing base.
Supplying and laying 125 Micron polythene separation membrane with overlapping of 300 mm at joints including cleaning the surface before placing the membrane etc., complete including cost of all materials, labour, T&P, tollage, taxes excluding GSTetc, all complete as directed by the Engineer In Chrage. N.B. : No payment will be made for overlapping.
Supplying & forming 12mm wide x 85mm deep longitudional joints by fixing 12 mm dia 640mm long HYSD bars @ 450mm C/C painted 50mm at center with anti-corrosive paint including providing & fixing bitumen paper, painting one side of concrete surface (250mm thick) with bituminous black paint, cutting grooves of required size and sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials, reinforcement, T&P, labour, Hire and running charges of all machineries, safety measures, taxes excluding GST etc., all complete as directed by Engineer-In-Charge.
Supplying & forming 12mm wide x 60mm deep contraction joints by fixing 32 mm dia 450mm long mild steel round bars @ 300mm C/C including painting two third of the bars with anticorrosive paint & covering the same with 125 micron polythene fitted & cutting grooves of required size and sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials including dowel bars, T&P, labour, Hire and running charges, of all machineries, safety measures, taxes excluding GST etc. all complete as directed by Engineer-In-Charge.
Supply, mixing, laying high precision, non shrink, cement based flowable, two stage expanding pouring grout viz. SIKA, FOSROC or equivalent of approved quality/brand, satishfying all its condition to apply, texturing the top surface by brooming, curing by hessian cloth with supply of all materials , labour, T&P, all taxes all safety arrangement, transportation charges, Port entry fees, tollage etc. all complete excluding GST and as directed by Engineer- in-Charge.
Supplying, transporting, fabrication of 150mm dia GI pipe of C-Class (Heavy Duty) of Zindal make or equivalant quality including fabricating, finishing, errection charges, making structurals of required shape and fixing in position with proper alignment, level with supply of all materials, labour, T&P, cutting, welding, bending charges, hire and running charges of all machineries, transportation charges, Port entry fees, safety arrangements, all taxes etc. complete excluding GST and as per direction of Engineer in charge.
Design, development, supplying and fixing of single sided Signboards of size 1.2m x 1.5m or required size made of Micro Prismatic Retro Reflective sheeting DG-3 pasted on 3 mm thick aluminum composite material as per IRC 67-2010, fixing each board with 8 Nos. of SS Mechanical Anchor Bolt of 8mm dia and 100mm long, the front side covered with Retro Reflective sheeting DG-3 with all letters, numerals and pictographs with border as per approved colour scheme including all taxes, transportation, tollage, hire & running charges of all equipments, Port entry fees, taking all safety precautions while installation etc. all complete excluding GST and as per direction of Engineer in charge.
Engagement of following equipments/machinaries for cleaning cutting/dressing the heaped earth/debrises or for any other purpose including Port entry fees, hire & running charges, fuel, lubricants, T&P, all taxes, operation expenses etc. all complete excluding GST and as per direction of Engineer in charge. NB: No idle hours shall be paid.
Hydraulic Excavator.
Tractor
M/S BHAIRAB CHARAN SWAIN
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
Aakar Infra Engineers PVT Ltd
AEC ENGINEERS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_723934.xls
BOQ • 0.29 MB
MPBTD.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .