Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical SANJEEVARAYAPURAM AVANIYAPURAM POST VANDAVASI TK 604504 TIRUVANNAMALAI 4 | VANDAVASI | TIRUVANNAMALAI | TAMIL NADU | 604504 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹57,200
Closing Date
28 Jan 2026, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Construction of 33/11KV yard equipment Plinths, cable duct, filling with quarry dust , Metal spreading and allied other civil works etc. for the Upgradation of existing 33/11kV SS into 110/33-11kV SS at Naidumangalam with 1x16 MVA, 110/33kV Power T
2026_EB_643642_1
TP1-147/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
NAIDUMANGALAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹57,200
10 Aug 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B n Medium rock and dense medium rock not requiring blasting 10%
Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete.
R:C:C 1:1.5:3 Raft using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
P:C:C 1:2:4 using 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification.
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
RCC 1:1.5:3 for Cover slab including cost of all material, lead, lift, etc., complete excluding steel reinforcement
Brick work in CM 1:5 using all ll Class Ground Moulded Chamber Burnt bricks for Basement including the cost of all materilas , lead, lift, labour, Centering Charges T&P etc., complete as directed by the Engineers at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete.
Fabriaction, galvanising and supply of foundation bolts of various sizes and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Providing Grout holes for equipment structures including cost of all materials, form work , labour, lead, lift etc. complete.
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Plastering with cm 1:5 mix using 12mm thick for inside & outside walls including cost of all materials,labour,lead, lift etc complete
Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. Complete - 40mm dia
Providing and laying UPVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. UPVC pipe 40mm dia
Providing and laying UPVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. UPVC pipe 32mm dia
Providing and laying UPVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. UPVC pipe 25mm dia
Levelling the ups and downs of the location by engaging JCB for marking of foundations, etc., with all hire charges etc complete.
Painting 2 coats with approved Plastic Emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceiling and other new surface and including cleaning ,preparing the surface and curing etc.complete.
Supplying, fabricating in GI angle/flats including cost of MS angle ,Flats , as per drawing and specification and galvanising ,placing in position , including cost of all materials, galvanizing charges , transportation, labour, lead, lift etc complete as directed by the dept. Engr at site
Supplying and spreading of gravel for yard area including cost of labour for spreading lead, lift, etc., complete.
Supplying and spreading of quarry dust for yard area including cost of labour for spreading lead, lift, etc., complete.
Supplying and spreading of 20mm HBG metal for yard area including cost of labour for spreading lead, lift, etc., complete.
Dismantling PCC met with below ground level during execution including labour, tools etc. complete.
Dismantling RCC met with below ground level during execution including labour, tools etc. complete.
Dismantling brick/ stone masonry in cement mortar met with below ground level during execution including labour, tools etc. complete.
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.13 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_771213.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .