Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
9 Sept 2026, 6:00 pm
CE CG GOA
MILITARY ENGINEER SERVICES, INDIAN COAST GUARD CHICOLNA, JNC NAGAR ROAD, BOGMALO POST, GOA 403806
COMPLETION OF BALANCE WORK FOR PROVISION OF PERIPHERY ROAD TOWARDS WESTERN SIDE OF RUNWAY AT ICGAS RATNAGIRI
2026_MES_784177_1
82100/A
Open Tender
Civil Works
Item Rate
365 days
RATNAGIRI
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹1,000
Yes
GE I CG RATNAGIRI
₹2.1 L
Yes
12 Aug 2026
12 Aug 2026
16 Sept 2026
13 Aug 2026
9 Sept 2026
2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance as in hard/ dense soil including removal of all vegetaion and unwanted material if reqd and making surfaces in reqd manner all as specified and directed. | 4,046.4 | SQM | - | - |
| - | Grass cutting on the surfaces of WBM as necessary including cleaning away all grasses, vegetaion and uprooting of saplings, shurbs, bushes, weeds, roots including making good in disrupted areas and removing rubbish etc complete to a distance exceeding 1.5km but not exceeding 5 km from starting point complete all as specified and directed | 7,868 | SQM | - | - |
| - | Excavation in trenches n.exc 1.5 m wide & n.exc 1.5 m in depth & getting out in soft disintegrated rock all as specified and directed. | 222.08 | CUM | - | - |
| - | Returning & filling including spreading, levelling, watering and well ramming in layers n.exc. 25 cm in soft/ disintegrated rock all as specified and directed. | 49.35 | CUM | - | - |
| - | Removal of excavated material n.exc. 50 m and depositing where directed at a level n.exc 1.5 m above the starting point. | 172.73 | CUM | - | - |
| - | Applying evenly a prime coat of Cationic Bitumen Emulsion SS1 confirming to IS:8887 at a rate of application of 0.7-1 kg/sqm on surface of WMM as specified in Table 500-3 of MoRTH specification for road and bridge works 2013, using mechanical sprayer including cleaning of WMM surfaces complete all as specified and directed. | 750.75 | X SQM | - | - |
| - | Applying evenly a tack coat of Cationic Bitumen Emulsion RC-70 217 at a rate of application of 0.2-0.3 kg/sqm on bituminous as specified in Table 500-5 of MoRTH specification for road and bridge works 2013, using mechanical sprayer complete all as specified and directed. | 750.75 | X SQM | - | - |
| - | M&L for premix dense bituminous macadam Grade 2 of VG-30 laid/ rolled & consolidated with 8 to 12 tonnes power roller to required gradient and camber (consolidated thickness 50 mm) with binder content 4.5% (min) by weight as per job mix complete all as specified and directed. | 375.38 | CUM | - | - |
| - | Applying evenly a tack coat of Cationic Bitumen Emulsion (RS-1) confirming IS 8887 at a rate of application of 0.2-0.3 kg/sqm on bituminous as specified in Table 500-5 of MoRTH specification for road and bridge works 2013, using mechanical sprayer complete all as specified and directed. | 809.55 | X SQM | - | - |
| - | M&L semi dense bituminous premix asphaltic concrete of consolidated thickness 40 mm rolled and compacted to required gradient and camber using paving bitumen using binder content @ 5.5% by wt of total mix all as specified. | 809.55 | X SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
PS.pdf
Tender Documents • 0.55 MB
BOQ_878632.xls
BOQ • 0.29 MB
COMMONPAGES_AND_SPLCONDITIONS.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].