Loading…
Loading…
Tender Value
₹1.3 L
EMD Value
₹6,500
Closing Date
7 Sept 2026, 6:55 pm
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
construction lane from Gh. Mohammad mir to shahzada and protection bundnear house ofmohd Bakir mir
2026_RDPR_321979_8
NIT_55_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹6,500
24 Aug 2026
24 Aug 2026
8 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches incl. carriages of Stones. | 2.37 | Cum | 937 | ₹2,220.69 |
| 2 | P/L in position cement concrete of M10 grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 6.36 | Cum | 5,733.2 | ₹36,463.15 |
| 3 | P/L in position cement concrete of M7.5 grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :4 F.A.(Natural/M-Sand) :8 C.A. ) with 20mm aggregate | 4.96 | Cum | 5,202.9 | ₹25,806.38 |
| 4 | Earth work in Trench excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 3.12 | Cum | 479.3 | ₹1,495.42 |
| 5 | P/l of 22mm thick cement concrete chequred tiles complete job. | 46.45 | Sqm | 903 | ₹41,944.35 |
| 6 | P/F Centering and shuttering and removal of the same | 15.33 | Sqm | 286 | ₹4,384.38 |
| 7 | P/A 12mm thick cement sand plaster 1:4 mix | 20.44 | sqm | 283 | ₹5,784.52 |
| 8 | Carraige by M.T. of S/Agg from Source to Site. | 10.1 | Cum | 505.64 | ₹5,106.96 |
| 9 | Carraige by M.T. of Sand from Source to Site. | 5.35 | Cum | 520.34 | ₹2,783.82 |
| 10 | Carraige by M.T. of Solling from Source to Site. | 2.37 | Cum | 405.31 | ₹960.58 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_1076979.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].