Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹15.0 L
EMD Value
₹14,998
Closing Date
13 Oct 2026, 5:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Zilla Parishad Raigad Alibag
Shivtirtha Building Zilla Parishad Raigad Alibag
Construction of Road at Bhatsai Adiwasi wadi, Tal- Roha, dist- Raigad
2026_RAIGA_1343337_5
ZP-RAIGAD-WORKDIV-46-2026-27
Open Tender
Civil Works
Percentage
270 days
Tal-Roha, Dist-Raigad
RZP Registration Contractor AS PER TENDER(OPEN)
12 documents required · 12 mandatory
₹590
₹14,998
8 Oct 2026
8 Oct 2026
14 Oct 2026
8 Oct 2026
13 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No.1:-Excavation for roadways in soft strata such as earth soil of all sorts sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 m and spreading for embankment or stacking, disposing as directed. | 21.73 | Cmt | 227.7 | ₹4,947.92 |
| 2 | Item No.2 :- Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 107.25 | Cmt | 2,021.66 | ₹2,16,823.04 |
| 3 | Item No.3 :- Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) | 128.7 | Cmt | 7,715.28 | ₹9,92,956.54 |
| 4 | Item No.4 :- Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm. height letter, figures including painting the lefters/figures with approved colour and shade complete | 1 | No. | 2,102.1 | ₹2,102.1 |
| 5 | Item No.5 :- Quality Control testing charges for C C M 20 ( Compressive Strength ) | 3 | No. | 690 | ₹2,070 |
| 6 | Item No.6 :- Disbursement of Royalty charages for construction materials like sand etc. complete. For Sand = Royalty + Surcharge(2%) + Distt. Minarals Foundation Cess (10%) = 211.95+4.23+21.19 = 237.37 Per Cum | 54.7 | Cmt | 237.37 | ₹12,984.14 |
| 7 | Item No.7 :- Disbursement of Royalty charages for construction materials like metal, rubble,murum, and earth etc. complete. For All other Minerals = Royalty + Surcharge (2%) = 211.95 + 4.23 = 216.18 Per Cum | 107.25 | Cmt | 216.18 | ₹23,185.31 |
| 8 | Item No.8 :- Reimbrsement of 18 % Gst | 1 | Gst | 2,25,912.43 | ₹2,25,912.43 |
| 9 | Item No. 9 :- Reimbrsement of 0.5% Labour Insurance | 1 | Ins | 6,275.35 | ₹6,275.35 |
| 10 | Item No. 10 :- Reimbrsement of 1% SQM charges | 1 | SQM | 12,550.69 | ₹12,550.69 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
BOQ_2296414.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .