Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAccepted-AOC | L1 | Accepted-AOC Acceept | |
| 2 | L2₹33.6 L+₹3.6 L (12.1%)Rejected-Finance | L2 | Rejected-Finance Reject |
Tender Value
₹31.2 L
EMD Value
₹32,000
Closing Date
25 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector DRDA Coimbatore
DRDA, Coimbatore
Consruction of Septic Tanks (3 nos) at Srilankan Tamilan Rehabilitation Camp at Kottur H/O Kottur Town Panchayat Package No TN 02-53 in Anaimalai Block of Coimbatore District under 2022-23 Scheme
2023_RDTN_316061_1
228/2022/B1 Dt 16.05.23
Open Tender
Civil Works - Buildings
Item Rate
90 days
Coimbatore
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹32,000
Yes
DRDA, Coimbatore
13 Jul 2023
17 May 2023
25 May 2023
17 May 2023
25 May 2023
17 May 2023
17 May 2023
Amount
Consruction of Septic Tanks (3 nos) at Srilankan Tamilan Rehabilitation Camp at Kottur H/O Kottur Town Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Centering Charges incuding cost and conveyance of all materials to site etc
Centering Charges incuding cost and conveyance of all materials to site etc
Fabrication and Placing in position of RTS bars etc complete
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Providing granolethic floor finish ISS metal to 25mm thick including cost and conveyance of all materials to siteand all labour charges for mixing, laying, curing etc complete .
Supplying and fixing in position C.I.Manhole covers (heavy duty) mof various sizes of best approved quality and as per standard specificationsetc., complete.0.6X0.6M Size etc., complete.
collection and Supply of Gritty gravel filling etc.
Subestimate Sewerline
Supply and delivery of 160 mm dia U PVC Non pressure pipe SN8-SDR 34 (S 16.5) Pipe
Earth work excavation of Trenches as per standard specificationsin all soilin Medium rock, and Dense Medium Rock not requiring Blasting.
Laying and Jointing of PVC pipes as per standard specifications
Refilling the trenches with excavated earth as per standard specifications
Subestimate Machine Hole(0.75m)
Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m inhard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Levelling coarse with P.C.C 1:4:8 (one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.
P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) for base slab using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.
Brick work in CM 1:3 (one cement and three sand) using S.R. cement and Bricks- II class Table Moulded (chamber burnt) of size 9" X 4 3/8" X 2 3/4" including cost of all materials, labour charges, curing etc., complete and as directed by Departmental Officers.
Inner plastering with CM 1:3 (one cement and three sand) 20mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.
Outer plastering with CM 1:5 (one cement and five sand) 12mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.
Benching - P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.
M30 using S.R. cement and 20mm size hard blue granite stone (machine crushed) excluding cost of reinforcement, fabrication and placing the grills in position and excluding cost of shoring and strutting but including curing, finishing and mixing concrete, using mechanical mixer machine and compaction by machanical vibrator etc., complete and as directed by Departmental Officers.
Supply and fixing of PVC encapsulated steps ( 1 No at 30 cm interval ) in the manhole.
Refilling with excavated earth (other than sand) complying with standard specifications for filling the foundations including stacking, watering & consolidation etc. complete as directed by Departmental Officers.
Supplying fabricating and placing in position of RTS grills at all heights for reinforcement including cost of steel for all works and labour charges including cost of binding wire etc., complete for all RCC works and as directed by Departmental Officers. upto 16mm dia.
F.R.C Manhole frame with cover (60cm dia heavy duty )
Subestimate Machine Hole(01.25m)
Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m inhard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Levelling coarse with P.C.C 1:4:8 (one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.
P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) for base slab using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.
Brick work in CM 1:3 (one cement and three sand) using S.R. cement and Bricks- II class Table Moulded (chamber burnt) of size 9" X 4 3/8" X 2 3/4" including cost of all materials, labour charges, curing etc., complete and as directed by Departmental Officers.
Inner plastering with CM 1:3 (one cement and three sand) 20mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.
Outer plastering with CM 1:5 (one cement and five sand) 12mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.
Benching - P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.
M30 using S.R. cement and 20mm size hard blue granite stone (machine crushed) excluding cost of reinforcement, fabrication and placing the grills in position and excluding cost of shoring and strutting but including curing, finishing and mixing concrete, using mechanical mixer machine and compaction by machanical vibrator etc., complete and as directed by Departmental Officers.
Supply and fixing of PVC encapsulated steps ( 1 No at 30 cm interval ) in the manhole.
Refilling with excavated earth (other than sand) complying with standard specifications for filling the foundations including stacking, watering & consolidation etc. complete as directed by Departmental Officers.
Supplying fabricating and placing in position of RTS grills at all heights for reinforcement including cost of steel for all works and labour charges including cost of binding wire etc., complete for all RCC works and as directed by Departmental Officers. upto 16mm dia.
F.R.C Manhole frame with cover (60cm dia heavy duty )
Subestimate Ventilating Shaft
Earth work excavation of Trenches as per standard specificationsin all soil for pipe laying works in Medium and Dense Medium Not Requiring Blasting
Earth work excavation for Pedastal Concrete to support Ventilating shaft.
PCC 1:2:4 using 20mm metal for Pedastal for Ventilating shaft.
(a)Centering for Pedastal above GL
(b)Below GL
Laying and Jointing of 160MM U PVC pipes as per standard specifications
Sand Bedding for the pipeline as per standard specifications
Refilling the trenches with excavated earth as per standard specifications
Supply and delivery of 160 mm dia U PVC Non pressure pipe SN8-SDR 34 (S 16.5) Pipe
Supply and delivery of 160 mm dia PVC male threaded adaptor
Supply and delivery of 150 mm dia male threaded adaptor
150mm DI Duck Foot Bend
150mm DI Flanged Pipe-5M
150mm flanged copper wire gauge cowl
Jointing 150mm flanges
Sub Estimate House Service Connection
Supply, conveying to site, laying and jointing of 110mm dia UPVC pipes including fixing of DWC pipes in MH and inspection chamber , earthwork excavation including cutting open BT road, refilling of trenches with excavated earth, etc., complete for house service connections from property limits to manholes on sewers. (For 112 HSC of average length 6 m each)
Disposal of surplus excavated earth in pipe laying works, manholes etc.,transporting to the sites specified by Engineer within 3 Km lead, including loading, spreading etc., complete and as directed by the Engineer.
Subestimate Inspection Chamber
Earth work excavation for foundation with initial lead of 10 m and initial lift of 2 m in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size of boulders including refilling the sides of foundation
Plain Cement Concrete 1:5:10 using 40 mm HBG for foundation
Brick work in C.M 1:5 using Class II Table moulded chamber burnt of size 9" x 4 3/8" x 2.75"
M30 Concrete for Precast slab
Supplying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc. complete complying with standard specification for Precast Cover slab including Handles
Plastering in cement mortar 1:5-12mm thick for side wall & bottom
Moulding charges for precast slab for cover slab bottom & side (from 40 uses calculate for 1 use)
Cutting, Welding, Bending including cost of crews etc., (from 40 uses calculate for 1)bitumen sprayer etc. complete km 0/0-1/080
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PR Construction And Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .