Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 CrAccepted-AOC NAMAKKAL | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹11.3 Cr+₹5.5 L (0.49%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.5 Cr+₹25.7 L (2.29%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹11.6 Cr+₹33.6 L (2.99%)Rejected-AOC ERODE | L4 | Rejected-AOC L4 | |
| 5 | L5₹11.8 Cr+₹52.7 L (4.70%)Rejected-AOC NO 5 37 VITTAMPALAYAM EMAPALLI TIRUCHENGODE TALUK NAMAKKAL DISTRICT 637211 | EMAPALLI | NAMAKKAL | TAMIL NADU | 637211 | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | PSK ENGINEERING CONSTRUCTION AND CO L8 | SRI SURYA CONSTRUCTION L9 | SABARI DHARAN ENGINEERING CONTRACTOR L7 | HariRam Constructions L4 | M/s Tharun Construction & Co L11 | M/s. SKS Builders and Promoters L2 | A & A BUILDERS AND PROMOTERS L3 | INDRA INFRASTRUCTURES L12 | ASHOK CONSTRUCTION L10 | RKK CONSTRUCTION L5 | GRM CONSTRUCTIONS L1 | SHRII VAARI CIVILTECH L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | |||||||||||||||
| 1.01 | Footing depth Up to 2.40m | 5,079.12 | m3 | 225 ₹11,42,802 | 340 ₹17,26,900.8 | 273 ₹13,86,599.76 | 150 ₹7,61,868 Lowest | 330 ₹16,76,109.6 | 270 ₹13,71,362.4 | 275 ₹13,96,758 | 200 ₹10,15,824 | 333 ₹16,91,346.96 | 286.16 ₹14,53,440.98 | 273 ₹13,86,599.76 | 275 ₹13,96,758 |
| 2.00Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | |||||||||||||||
| 2.01 | Footing depth Up to 2.40 to 3.30m | 413 | m3 | 263 ₹1,08,619 | 340 ₹1,40,420 | 370 ₹1,52,810 | 150 ₹61,950 Lowest | 420 ₹1,73,460 | 300 ₹1,23,900 | 370 ₹1,52,810 | 195 ₹80,535 | 400 ₹1,65,200 | 386.85 ₹1,59,769.05 | 369 ₹1,52,397 | 375 ₹1,54,875 |
| 3.00Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | |||||||||||||||
| 3.01 | Depth Up to 2.40m | 2,036 | m3 | 150 ₹3,05,400 | 220 ₹4,47,920 | 150 ₹3,05,400 | 150 ₹3,05,400 | 170 ₹3,46,120 | 150 ₹3,05,400 | 150 ₹3,05,400 | 170 ₹3,46,120 | 210 ₹4,27,560 | 155.17 ₹3,15,926.12 | 148 ₹3,01,328 Lowest | 150 ₹3,05,400 |
| 3.02 | Depth Up to 2.40 to 3.40m | 1,025 | m3 | 180 ₹1,84,500 | 220 ₹2,25,500 | 165 ₹1,69,125 | 170 ₹1,74,250 | 175 ₹1,79,375 | 160 ₹1,64,000 | 155 ₹1,58,875 Lowest | 170 ₹1,74,250 | 220 ₹2,25,500 | 170.69 ₹1,74,957.25 | 163 ₹1,67,075 | 165 ₹1,69,125 |
| 3.03 | Depth Up to 3.40-4.40m | 1,378 | m3 | 205 ₹2,82,490 | 220 ₹3,03,160 | 180 ₹2,48,040 | 190 ₹2,61,820 | 200 ₹2,75,600 | 170 ₹2,34,260 Lowest | 170 ₹2,34,260 Lowest | 190 ₹2,61,820 | 230 ₹3,16,940 | 187.76 ₹2,58,733.28 | 179 ₹2,46,662 | 180 ₹2,48,040 |
| 3.04 | Depth Up to 4.40-5.40m | 1,731 | m3 | 230 ₹3,98,130 | 220 ₹3,80,820 | 210 ₹3,63,510 | 200 ₹3,46,200 | 210 ₹3,63,510 | 180 ₹3,11,580 Lowest | 180 ₹3,11,580 Lowest | 190 ₹3,28,890 | 250 ₹4,32,750 | 206.53 ₹3,57,503.43 | 197 ₹3,41,007 | 200 ₹3,46,200 |
| 3.05 | Depth Up to 5.40-6.40m | 2,084 | m3 | 255 ₹5,31,420 | 220 ₹4,58,480 | 220 ₹4,58,480 | 210 ₹4,37,640 Lowest | 250 ₹5,21,000 | 220 ₹4,58,480 | 215 ₹4,48,060 | 220 ₹4,58,480 | 270 ₹5,62,680 | 227.18 ₹4,73,443.12 | 217 ₹4,52,228 | 215 ₹4,48,060 |
Tender Value
₹14.9 Cr
EMD Value
₹7.6 L
Closing Date
15 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, PWD
The Chief Engineer,PWD., Projects, Chepauk, Chennai-05.
Construction of New Building for Government ITI Building in Sendamanagalam Taluk of Namakkal District.
2026_HE_694133_1
03CE/2026
Open Tender
Civil Works - Buildings
Lump-sum
360 days
Sendamangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7.6 L
27 Nov 2026
14 Aug 2026
16 Sept 2026
14 Aug 2026
15 Sept 2026
14 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | |||||
| 1.01 | Footing depth Up to 2.40m | 5,079.12 | m3 | - | - |
| 2Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 2.01 | Footing depth Up to 2.40 to 3.30m | 413 | m3 | - | - |
| 3Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | |||||
| 3.01 | Depth Up to 2.40m | 2,036 | m3 | - | - |
| 3.02 | Depth Up to 2.40 to 3.40m | 1,025 | m3 | - | - |
| 3.03 | Depth Up to 3.40-4.40m | 1,378 | m3 | - | - |
| 3.04 | Depth Up to 4.40-5.40m | 1,731 | m3 | - | - |
| 3.05 | Depth Up to 5.40-6.40m | 2,084 | m3 | - | - |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
CoverOne.pdf
Tender Documents • 0.51 MB
CoverTwo.pdf
Tender Documents • 2.49 MB
BOQ_834515.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .