| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical GALI NO 24 SURYAN NAGAR HISAR HARYANA 125005 | HISAR | HISAR | HARYANA | 125005 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical GALI NO 5 SUNAROWALI VINOD NAGAR MILL GATE HISAR | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
19 Sept 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
ANNUAL MTC. ESTIMATE OF INTERNAL SEWERAGE SCHEME FOR SECTOR-1,4,3,5,13P,15,16-17, UE-II, 27-28, PLA, MGA and ODC HISAR (2026-27)
2026_HBC_546230_1
20260957C3C2 33A6 461D 990D E22F8B71390F259HSV
Open Tender
Civil Works
Works
60 days
Hisar
Construction of RCC slab on Sewerage Manhole at various locations Sector PLA, Hisar and all other works contingent thereto
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
21 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge | 15 | Each | 298 | ₹4,470 |
| 2 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | 17.77 | cum | 4,464 | ₹79,325.28 |
| 3 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 49.25 | Sqm | 208 | ₹10,244 |
| 4 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,599 | kg | 66 | ₹1,05,534 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_625858.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .