Loading…
Loading…
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
1 Sept 2026, 6:00 pm
GE AF OJHAR
GE AF OJHAR AIR FORCE STN OJHAR DIST NASHIK PIN 422221
TERM CONTRACT FOR ARTIFICER WORKS FOR B/R AT 25ED AFS DEOLALI UNDER GE (AF) OJHAR
2026_MES_768338_2
8408/E8
Open Tender
Civil Works - Others
Percentage
335 days
GE AF OJHAR
As per tender doucements
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹40,000
Yes
20 Aug 2026
20 Aug 2026
3 Sept 2026
20 Aug 2026
1 Sept 2026
27 Aug 2026
20 Aug 2026 - 26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Term Contract for Artificer works to perform such services and execute such works upon the terms and conditions contained or referred to in the tender documents and upon the conditions as per tender documents contained and as are enumerated in the MES Standard Schedule of rate Part-I, 2020 (specifications) together with amendment No. to and MES Standard Schedule of rate Part-II, 2020 (Rates) together with amendment No. to and General Conditions of Contract (IAFW-2249) together with errata 1 to 20 amendment No. 1 to 40 forming part of tender document during the period of ONE YEAR from the date of acceptance at the Rates contained in the aforesaid MES Schedule.
NOTE:-(i) Tenderer shall insert percentage at the 6th row and column ‘F’of this BOQ excel sheet.
(ii) Tenderer shall refer and select the option excess (+) or less (-) sheet to quote the percentage above or below MES standard of rate Part-II 2020.If no %ge excess (+) or less (-) is offered NIL %ge shall be considered.
(iii) Amount inserted by the MES under rate column and the total amount reflected in this page is approximate and for reference only being Term Contract. Separate work orders as per requirement of works during currency of contract will be ordered. The work orders shall be priced at rates given in SSR and shall be adjusted by the percentage quoted by the contractor.
(iv) Irrespective of amount generated by the system in the BOQ. Acceptance of Contract shall be made for the total estimated amount and percentage (Excess/Less) thereto quoted by the tenderer. However the total contract sum shall not exceed estimated amount shown in BOQ. | - | MES Standard Schedule of rate Part-I, 2009 (specifications) together with amendment No.1 to 3 and MES Standard Schedule of rate Part-II, 2020 (Rates) together with amendment No. to | 20,00,000 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_880160.xls
BOQ • 0.26 MB
TENDER8408N.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].