Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.91Admitted-Finance | ₹3.91 | L1 | Admitted-Finance |
| 2 | L2₹4.96Admitted-Finance | ₹4.96 | L2 | Admitted-Finance |
| 3 | L3₹5.25Admitted-Finance | ₹5.25 | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Does not Qualified Techno-Commercial Criteria/Conditions |
| Sl No | Description | Qty | Unit | BPN Commodities LLP L3 | KUNDAN GREEN ENERGY PRIVATE LIMITED L2 | ULTRAVIBRANT SOLAR ENERGY PVT LTD L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cost of Energy Generated by SPD after Setting up of 7MW/1.5MWH Grid-Connected Solar PV Projects with Battery Energy Storage System (BESS) at Stakna Power Plant in Leh-Ladakh under RESCO Mode . Per unit cost for entire contract period | 1 | KWH | 5.25 ₹5.25 | 4.96 ₹4.96 | 3.91 ₹3.91 |
Tender Value
Refer Docs
EMD Value
₹1.3 Cr
Closing Date
22 Sept 2025, 2:00 pmClosed
Executiver Engineer Generation Leh
O/o the Executive Engineer Generation Division Choglamsar Leh
Setting up of 7MW/1.5MWH Grid Connected Solar PV Projects with Battery Energy Storage System (BESS) at Stakna Power Plant in Leh- Ladakh under RESCO Mode through Tariff Based Competitive Bidding
2025_PDNRE_17413_1
e-NIT No 10 of 2025-26
Open Tender
Electrical Works
Stakna Leh
as per RfS Document
4 documents required · 4 mandatory
₹10,000
Pay and accounts officer PDC Leh
₹1.3 Cr
O/o the Chief Engineer Generation Wing UT Ladakh
22 May 2026
4 Sept 2025
23 Sept 2025
5 Sept 2025
22 Sept 2025
6 Sept 2025
11 Sept 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.34 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_3.pdf
PDF • 1.10 MB
BOQ_42412.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid