Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹5.1 L
Closing Date
15 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
DRM WA
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note: for b (i) separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (ii)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.
(b) (iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contract or through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Similar Nature of work: - Any civil engineering work .
2 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/ We have visited the works site and I / We am / are aware of the site conditions.
ADEN (HQ) III /JP sub division: Zonal work Zone no. 7 - Kalwar colony, Panipatch colony staff quarters, Service buildings of Station Area including ancillary buildings like booking, parcel, PRS etc. (Area controlled by Station Director) & Service buildings of DRM office , RCT, SSE(W)-S-I, SSE(P.Way)-South & North-JP, Offices of station area which is not controlled by station director etc. for Sanitary work, all type of repair work , any type of road work as per DSR 2023 & horticulture work as per 2020 for the period of from 01.07.26 to 30- 06-2028 (Two Years). (In SSE(Works) S-1/JP Jurisdiction) Zone- 7.
ENGG-JP-2026-27-67
ENGG-JP-2026-27-67
Open
Works - General
24 Months
Jaipur, Rajasthan
₹0
₹5.1 L
15 Jul 2026
23 Jun 2026
1 Jul 2026
89 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ 6955051.52 Below/P | ||
| — | — | — | 42,188 | ||
| (a)-Ch.1.0 | Sch | - Carriage of Materials. | and Machinery | ||
| — | — | — | 2,10,940 | ||
| (b)-Chapter | Sch | 9 - Wood and PVC | — | ||
| — | — | — | 4,21,880 | ||
| (c)-Chapter | Sch | 10 - Steel work & | — | ||
| — | — | — | 10,54,700 | ||
| (d)-Chapter 13.1 to | Sch no. | 13 - Item no. 13.36) | Polishing & Varnishing | ||
| — | — | — | 6,32,820 | ||
| (e)-Chapter | Sch | 17 -Sanitary | supply & Chapter 19 | ||
| — | — | — | 2,10,940 | ||
| (f)-Chapter | Sch | 16- Road Work. | — | ||
| — | — | — | 43,81,583.52 | ||
| (g)-All other 14, 15, 20, | Sch ), | chapters not 22, 23, 24, 25 & 26 | 7, 8, 11, 12, 13(Item | ||
| — | — | — | Above/ 2265948.48 Below/P | ||
| — | 100.00 | — | — | ||
| Cleaning I. C. and M. holes including the S.W. pipes line from latrines between to pass M.H. including taking out all type of silt rubbish and disposal up to 5 km. away as per direction of Engineer-In-Charge at site including placing back M.H / I.C. covers. | — | — | — | 1,17,189 | |
| — | 60.00 | — | — | ||
| Hiring of pressured mud cleaning machine for removing blockage & deep main holes (capacity 2000 litres) including all type of operation consumable material, fuel, labour, taxes etc. as a complete job. | — | — | — | 86,661 | |
| — | 24.00 | — | — | ||
| All in all repair & maintenance of Reverse Osmosis system including replacement of all components/ parts e.g. Pump, Membrane, Filters, Power supply, S.V., F.R., Housings, PVC connecting Pipes, Water Sensors, UV lamps and any other parts of machine etc. as required. The Job includes servicing of all the machines quarterly and also as and when required on receiving the complaints or as directed by Railway representative/ Engineer in charge. (i)R.O. System 250 LPH Out Put Capacity | — | — | — | 68,014.08 | |
| — | 48.00 | — | — | ||
| All in all repair & maintenance of Reverse Osmosis system including replacement of all components/ parts e.g. Pump, Membrane, Filters, Power supply, S.V., F.R., Housings, PVC connecting Pipes, Water Sensors, UV lamps and any other parts of machine etc. as required. The Job includes servicing of all the machines quarterly and also as and when required on receiving the complaints or as directed by Railway representative/ Engineer in charge. (ii)R.O. System 50 LPH Out Put Capacity | — | — | — | 70,818.72 | |
| — | 48.00 | — | — | ||
| All in all repair & maintenance of Reverse Osmosis system including replacement of all components/ parts e.g. Pump, Membrane, Filters, Power supply, S.V., F.R., Housings, PVC connecting Pipes, Water Sensors, UV lamps and any other parts of machine etc. as required. The Job includes servicing of all the machines quarterly and also as and when required on receiving the complaints or as directed by Railway representative/ Engineer in charge. (iii)R.O. System 15 LPH Out Put Capacity | — | — | — | 28,879.68 | |
| — | 50.00 | — | — | ||
| Providing and fixing roller blind made out of Superior Quality Blackout fabric of approved shade including powder coated extruded anodized aluminium head rail (made of high strength reinforced plastic), Idler(made of high strength reinforced plastic), roller tube (made of powder coated extruded anodized Aluminium grooved section of 38mm OD), bottom rail (made up of powder coated extruded anodized aluminium group section of 21mm OD), operating chain (made of 4.5 mm plastic beads molded on 2.2 mm polyester cord), Fixing brackets and clamps, all accessories etc complete (Vista or equivalent make). Rates include cost of all material, labour, T&P, transportation, all taxes, GST etc complete. | — | — | — | 62,275 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC 2022
ATTACHMENT
CorrectionSlip1to11.pdf
ATTACHMENT
CableCutletterofHQ_compressed1.pdf circular of cable cut
ATTACHMENT
GCC-2022-ACS6-updatedcompressed.pdf
ATTACHMENT
CableCutletterofHQ_compressed1.pdf
ATTACHMENT
TenderScheduleZone-726-27_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .