Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical MUZAFFARNAGAR MEERUT ROAD GEHRA BAGH OPP PWD WARE HOUSE MUZAFFARNAGAR UTTAR PRADESH 251002 | MUZAFFARNAGAR | UTTAR PRADESH | 251002 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.6 L
EMD Value
₹8,600
Closing Date
2 Feb 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
ETC MU T 46 2023 24
2024_UPTCL_882463_1
ETC MU T 46 2023 24
Open Tender
Electrical Works
Item Rate
60 days
BADHAIAKALAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD MUZAFFARNAGAR
₹8,600
1 Mar 2024
18 Jan 2024
2 Feb 2024
18 Jan 2024
2 Feb 2024
18 Jan 2024
Amount
Shorting/counting stacking ,erection mark wise and proper loading of structure in Truck/trailer
Safe carriage of loaded structure from EFU Naini Allahabad to 220 KV S/S Badhaikalan approximate distance 850 Km
Unloading of structure from the Truck /Trailer . Its shorting, counting & proper stacking at 220 KV S/S Badhikalan as par direction of supervising engineer
Erection of Main & Auxiliary structure consisting of AXM,BCT,BBL, BTI,ALP, CGM,CCM.ABL etc. including all allied works complete in all respect. Department shall provide structure & nut and bolts etc. The works shall be strictly carried out as per drawing & technical specification.
Erection of equipment as per instructon manual of various equipments and technical specification including shifting of material, equipments from store to erection site including all their associated work with the help of crane provided by the contractor at their own cost for completion of the job satisfactorily:-
145 KV CB with structure
145 KV CTs
145 KV Bus isolator
145 KV Tandem isotator
132 KV CT Junction Box
33 KV VCB with structure
33 KV CTs
33 KV Bus isolator
132KV PI on ALP type structure
33 KV CT Junction Box
T/F Control & Relay Panel
T/F RTCC Panel
Safe Dismantling of 145 KV C.T. with structure as per instructon manual of various equipments and technical specification including shifting of material, equipments including all their associated work with the help of crane provided by the contractor at their own cost for completion of the job satisfactorily
Stringing and proper sagging of new 132 KV Overhead Jack Bus section (R, Y & B-phase) by ACSR Panther conductor for approx. 24 Mtr. span. The work include cutting of conductor, making of bus bar of appropriate length, hoisting of 70 / 120 KN Disc insulator, tension fitting etc.
Stringing and proper sagging of new 132 KV Overhead Jack Bus section (R, Y & B-phase) by ACSR Panther conductor for approx. 58 Mtr. span. The work include cutting of conductor, making of bus bar of appropriate length, hoisting of 70 / 120 KN Disc insulator, tension fitting etc.
Stringing and proper sagging of new 33 KV Jack Bus section (R, Y & B-phase) by ACSR Panther conductor for approx. 18 Mtr. span. The work include cutting of conductor, making of bus bar of appropriate length, hoisting of 70 / 120 KN Disc insulator, tension fitting etc.
Complete jumpering work of different equipments i.e. BI, CB, CT etc. by Single / Twin ACSR Moose / Zebra / Panther conductor including cutting, tilting & tightening with PG Clamps/terminal clamps at both ends as per technical standard and direction of supervising engineer to complete the 132 KV transfer Bus Coupler Bay in all respect.
Complete jumpering work of different equipments i.e. BI, CB, CT, PT, LI, HV & LV Bushing etc. by Single / Twin ACSR Moose / Zebra / Panther conductor including cutting, tilting & tightening with PG Clamps/terminal clamps after opening of existing jumpers of TBC bay at both ends as per technical standard and direction of supervising engineer to complete the 40 MVA T/F-I 132 KV & 33 KV Side Bay in all respect.
Laying and dressing of control cable in trenches after removal of trench cover as per cable schedule including clamping with 25x3mm Al. strip and GI Nut and Bolts including cutting, peeling of the control cable.
2X2.5 Sq.mm.
4X2.5 Sq.mm.
6X2.5 Sq.mm.
10X2.5 Sq.mm.
Termination of cables as laid above as per cable schedule including making necessary holes in panel base plate or junction box as per site requirement. Fixing of cable glands of appropriate size. Supply & providing ferrules on each core of cable & its terminaton at both ends and all other associated work.
2X2.5 Sq.mm.
4X2.5 Sq.mm.
6X2.5 Sq.mm.
10X2.5 Sq.mm.
Earthing of structure and equipments:-
Cutting, straightening, bending, laying 800 mm. below in side ground and above ground of following size of MS flat for earthing of Main structure, Auxiliary structure, equipments structure including welding with main earthmat and with object to be earthed, excavation of soil & its back filling, painting and all other associated works as required to complete the work satisfactorily.
MS flat of size 75x10 mm.
MS flat of size 50x6 mm.
MS flat of size 25x6 mm.
Earthing of 33 KV LAs with 75x10 mm MS flat after making rectangular configuration along with Six Nos. (3 meter length) 40 mm dia M.S. electrodes as per drawing & technical specification.
Earthing of 120 KV LAs with 75x10 mm MS flat after making rectangular configuration along with Six Nos. (3 meter length) 40 mm dia M.S. electrodes as per drawing & technical specification.
Shifting of 33/0.4 KV Sub station transformer at new plinth by suitable arrangement the work includes dismantling of fuse set and jumpering and erection of S/S T/F at new plinth,erection of fuse set on ALP structure and its jumper and earthing and all other associated work to complete the job
Laying and trmination of 400 sq mm Power cable (approx 30Mtr) and joint with existing power cable with suitable arrangement for connection with station transformer.
Shifting of 40 MVA T/F at 220 KV S/S Amroha existing palace to loading place 20 Mtr. Distance Including turning to tank if required, including all T&P and work required to complete the job satisfactorily.
Loading of 40 MVA T/F main tank along with accessories at 220 KV Sub-station Amroha, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle.
Carriage of 40 MVA T/F main tank and all accessories from 220 KV Sub-station, Amroha to 220 KV Sub - station Badhaikalan Muzaffarnagar by Pvt. Truck / Trailer. Distance about 160 Km.
Unloading of 40 MVA Transformer by opening of lashing of main tank of 40 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank including shifting and placement of transformer upto plinth and unloading of various Transformer accessories of above 40 MVA T/F like oil filled drums, bushing conservator tank, cooling fan etc. from Track/ Trailer at 220 KV S/S Badhaikalan Muzaffarnagar.
Complete erection of 40 MVA 132/33 KV Transformer by erection of radiators, conservator tank, all bushings, their turrets connecting all pipe lines, cooling fans, motor driver mechanism of tap changer, RTCC panels, oil pumps and associated oil pipe lines etc. to complete the job satisfactory including first filing of oil and topping up of Transformer oil (Not circulation) in tank, radiators, oil pipe lines, conservator tank etc. and attending the oil leakage if any, and all other associated works for satisfactorily completion of work. No department crane/ T & P shall be provided.
Centrifuging of complete T/F oil ( 20 KL) before filling in main tank of Transformer up to desired BDV may be archived (as recommended by Manufacturer), Centrifuging of Transformer oil by circulating in radiators, main tank conservator through centrifuging machine and taking the BDV of oil periodically and IR value of the Transformer before starting the filtration cycle till the required value is achieved as per direction of supervising engineer. The work includes all the work related to centrifuging the oil. All T&P, labour shall be provided by the contactor.
Making of Delta earthing consisting of fabrication of delta set with 3 Nos. 40mm/36mm dia. size 3 Mtrs. Long electrodes its placing inside the ground and connecting all the three electrodes with 75x10mm M.S flat 700mm deep with neutral bushing of Transformer as per approved drawing of department with two nos. MS Flat for Transformers:
M/s S.S. Refregeration
Technocrat Electrical
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .