Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.3 LAWARDED | AWARDED |
Tender Value
₹8.4 L
EMD Value
₹21,000
Closing Date
5 Apr 2025, 9:30 pmClosed
Public Works Department
Renovation Of Sri Mahakolkat Kalikadevi Seva Trust Temple in 13th Ward, Old PLCU TB Dam in Hosapete Tq, Vijayanagara Dist.(HOA 8443 Deposit MLA Grant)
PWD/2024-25/BD/WORK_INDENT20204
PWD/2024-25/BD/WORK_INDENT20204
Open
Buildings
Electronic Documents, First(One Cover)
PWD Division Office Hosapete
₹500
₹21,000
26 Mar 2025
26 Mar 2025
4 Apr 2025
Renovation Of Sri Mahakolkat Kalikadevi Seva Trust Temple in 13th Ward, Old PLCU TB Dam in Hosapete Tq, Vijayanagara Dist.
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixe...
Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24, Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixe...
Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Appendix 1 , Page No : 115 , Vol 1 ) Percentage on finished rate of concrete per m3
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixe...
Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Appendix 1 , Page No : 115 , Vol 1 ) Percentage on finished rate of concrete per m3
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Appendix 1 , Page No : 115 , Vol 1) Percentage on finished rate of concrete per m3
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Appendix 1 , Page No : 115 , Vol 1) Percentage on finished rate of concrete per m3
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Appendix 1 , Page No : 115 , Vol 1) Percentage on finished rate of concrete per m3
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .