Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹296.82 (0.20%)Admitted-Fee/PreQual/Technical/Finance AAGNOO VERINAG | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,440
Closing Date
17 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O CONCRETE PATH NHO MD IQBAL SHEIKH, MD YOUSUF LONE, BASHIR AH LONE AND ABDUL GANIE DAR AT TWO SPOTS BLOCK HILLER SHAHABAD
2026_RDPR_315376_24
ENIT58of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,440
19 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | - | sqm | - | - |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soils | - | cum | - | - |
| 0.0 | Providing and laying of dry stone soling, tightly hand packed including carrage from 15 km. | 1 | cum | 1 | ₹1 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Tile Path Sides | 1 | cum | 1 | ₹1 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concret | - | sqm | - | - |
| 0.0 | carriage of materials by M.T | - | - | - | - |
| 0.9 | crushed stone aggregates 15km, | 1 | cum | - | - |
| 0.0 | sand lead 25km | 1 | cum | 1 | ₹1 |
| 0.0 | Carriage of cement, Shuttring and paver blocks. | - | trip | - | - |
| 0.0 | Provision for signboard & photographs, and other unforeseens (sta) | - | Ls | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1022739.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .