| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.1 LAccepted-AOC VILLAGE BIBIPUR JATTAN 65 BIBIPUR JATTAN INDRI KARNAL HARYANA 132041 | KARNAL | KARNAL | HARYANA | 132041 | ₹54.1 L | L1 | Accepted-AOC WA |
| 2 | L2₹56.0 LRejected-AOC 787 ISMAILABAD 136129 | KURUKSHETRA | HARYANA | 136129 | ₹56.0 L | L2 | Rejected-AOC WNA |
| 3 | L3₹59.4 LRejected-AOC 610 3 KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | ₹59.4 L | L3 | Rejected-AOC WNA |
| 4 | L4₹59.9 LRejected-AOC VPO MAHRA VPO MAHRA TEHSIL GOHANA 131301 | SONIPAT | HARYANA | 131301 | ₹59.9 L | L4 | Rejected-AOC WNA |
| 5 | L5₹60.0 LRejected-AOC WARD NO 2 KAILASH NAGAR PALWAL | PALWAL | ₹60.0 L | L5 | Rejected-AOC WNA |
Tender Value
₹73.2 L
EMD Value
₹1.5 L
Closing Date
2 Feb 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
Providing and Laying of RCC Storm Water Line and Repair of Brick Drain
2026_HBC_498982_1
2026048D9FAC 76E1 49CF B3B3 643F9BB7448F240HSV
Open Tender
Civil Works
60 days
Karnal
2 documents required · 2 mandatory
₹2,000
₹1.5 L
Yes
12 Jun 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
2 Feb 2026
24 Jan 2026
[10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate]
[11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) [Through Rate]
[11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) [Through Rate]
[11.52]Cement rendering on plaster 1 mm thick [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[2.B0241] B0241. 100 mm dia PVC pipe [Rate]
[21.95.1]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 1. 350 mm [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[5.6]Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.29.2]Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. [Through Rate]
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate]
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate]
[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_577553.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid