Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | ₹7.2 L | L1 | Accepted-AOC aoc |
| 2 | L2₹7.2 LRejected-Finance | ₹7.2 L | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted
As per Second Lowest. |
| 3 | L2₹7.2 LRejected-Finance | ₹7.2 L | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted
As per Second Lowest. |
| 4 | L2₹7.2 LRejected-Finance | ₹7.2 L | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted
As per Second Lowest. |
| 5 | L2₹7.2 LRejected-Finance H NO 2741 SECTOR 15 SONEPAT 131001 | SONEPAT | SONIPAT | HARYANA | 131001 | ₹7.2 L | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted
As per Second Lowest. |
Tender Value
₹8.4 L
EMD Value
₹84,421
Closing Date
17 Dec 2025, 3:00 pmClosed
C.E.3
Zone 3
Imp. Of Interlocking tiles from Block No 1 to Block No 5 and Block No 5 in ward 100 Zone 03
2025_NNKAN_1096547_1
133/A.a.3/25-26
Open Tender
Civil Works
Imp. Of Interlocking tiles from Block No 1 to Blo
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹84,421
30 Jun 2026
5 Dec 2025
17 Dec 2025
5 Dec 2025
17 Dec 2025
5 Dec 2025
Earth Work in cutting in ordinary soil lead 30 mt & lift 1.5 mtincl lab T&P etc all comp
Providing and laying in cement concrete 4:2:1 of not less than strength of m 150 ( stone ballast4 (20 mm normal size) :2 approved coarse sand:1 cement) and curring etc all comp
Providing and laying in cement concrete 4:2:1 of not less than strength of m 150 ( stone ballast4 (20 mm normal size) :2 approved coarse sand:1 cement) and curring etc all comp
Providing and laying of Rubber moulded interlocking concrete block With 80 mm thick ICBP75 % Gray & 25 % Red/Yellow coloured) having strength not less than 30 KN/m2 complete etc all comp
Class-150 Brick work in 1:4 cement & Coarse sand mortar in foundation and plinth including supply of all materials etc all comp
Diposal of earth up to 3 km incluidng loasing & unloading etc all comp
Add 18% GST
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2018712.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.35 MB
BOQ_2018712.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid