Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC | 1 | Accepted-AOC aoc | |
| 2 | 2₹2.4 L+₹79.51 (0.03%)Rejected-Finance | 2 | Rejected-Finance 2 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
18 Oct 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
RDSSC
constructtion of fall in hilgi mr km 3.800
2024_UPIDC_964042_1
02/EE/2024-25/date 30-09-2024
Open Tender
Civil Works - Canal
Item Rate
30 days
raebareli
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹25,000
Yes
24 Oct 2024
10 Oct 2024
18 Oct 2024
10 Oct 2024
18 Oct 2024
10 Oct 2024
Amount
Earthwork in excavation in foundation including chharri-bajari, wet earth, slush kanker which is not separable i.e. all type of soils including dewatering with all leads, lifts, labour, T&P and proper disposal etc complete.
Providing and laying A20-M10 mix (1:3:6) plain cement concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) in foundation complete in all respect excluding centering shuttering but including all cost of material, labour and T&P etc to complete the jobas per sanctioned drawing & specification in the direction of Engineer- In - Charge Per cum.
Brick masonry in 1:4 C.M with OPC cement and banda c-sand (F.M 1.5 - 2.0) mortar using M-150 class Bricks complete in all respect including all lead, lifts, all cost of material, labour, curing ,T&P required for proper completion of work as per sanctioned drawing & specification in the direction of Engineer-In -Charge. (Unit Cum.) cum.
Brick on edge pitching in 1:4 cement sand mortar including cost of all materials , labour and T & P etc.(unit SQM)
Struck cement pointing with cement sand mortar 1:2 complete in all respect including all lead lifts cost of materials labour and T&P etc. per sqm.
ms rajesh kumar
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .