Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | Rejected-Technical Technically Rejected |
| 4 | Rejected-Technical | Rejected-Technical Technically Rejected |
| 5 | Rejected-Technical 88 30 RAMASAMY GARDEN ADYAR ARUNACHALAPURAM ADYAR CHENNAI TAMIL NADU 600020 | CHENNAI | TAMIL NADU | 600020 | Rejected-Technical Technically Rejected |
Tender Value
Refer Docs
EMD Value
₹87,400
Closing Date
9 Nov 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
O/o The Superintending Archaeologist, Archaeological Survey of India, Chennai Circle
MW(CONS) TO RAMPARTS, GATES, BASTIONS, MOATS, WATER CISTERNS UNDERNEATH AND GLACIS OF ST. GEORGE FORT, CHENNAI, TAMIL NADU 2022-23
2022_ASI_718870_1
Sout/Chen/Chen/11 I/11138055
Open Tender
Civil Works - Buildings
Works
120 days
As Per Tender Documents
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹87,400
Yes
14 Nov 2022
19 Oct 2022
10 Nov 2022
19 Oct 2022
9 Nov 2022
19 Oct 2022
Amount
Removal of heavy jungle grown over the rampart walls and moat including medium growth of trees and bushes and conveying them outside the monument etc., including cost, conveyance of all materials, labour charges and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials. (proposed quantity may be vary as per site condition)
Removal of heavy jungle grown over the rampart walls and moat area including uprooting the medium growth of trees and bushes and conveying them outside the monument etc., complete including cost, conveyance of all materials, labour charges and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials. (proposed quantity may be vary as per site condition)
Providing and laying of brick jelly of 20mm size concrete 1:2:4 over upper portion of rampart to average thickness of 0.15m for giving proper gradient including cost and conveyance of all materials and labour charges etc., scaffolding charges if any etc., curing charges, the mixing of concrete must be done using mechanical mixer and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials. (proposed quantity may be vary as per site condition)
Providing plastering to the top portion of upper rampart walls 20mm thick, using mechanically grinded Lime mortar 1:2 for southern side of George Gate including filling the existing damaged portion and strengthening the surface of existing wall etc by the way of underpinning using brick bats with lime mortar 1:2 etc. including cost, conveyance of all materials, labour charges, erecting and dismantling the scaffolding etc., grinding charges of lime mortar, curing charges etc. as directed by the department officials time to time and also the charges are including EPF, ESI, GST and other applicable taxes if any etc. complete. (Proposed quantity may vary as per site condition)
Carefully removing the damaged / dead / pealed out plastering the from the existing walls and re-plastering the same using mechanically grinded Lime mortar 1:2 for southern side and northern side of George Gate including filling the existing damaged portion and strengthening the surface of existing wall etc by the way of underpinning using brick bats with lime mortar 1:2 etc. including cost, conveyance of all materials, labour charges, erecting and dismantling the scaffolding etc., grinding charges of lime mortar, curing charges etc. as directed by the department officials time to time and also the charges are including EPF, ESI, GST and other applicable taxes if any etc. complete. (Proposed quantity may vary as per site condition)
Carefully removing the damaged / dead / pealed out plastering from the existing pillars in patches and top portion ornamental designs and re-plastering the same using mechanically grinded Lime mortar 1:2 for eastern side and western side of George Gate including filling the existing damaged portion and strengthening the surface of existing wall etc by the way of underpinning using brick bats with lime mortar 1:2 etc. including cost, conveyance of all materials, labour charges, erecting and dismantling the scaffolding etc., grinding charges of lime mortar, curing charges etc. as directed by the department officials time to time and also the charges are including EPF, ESI, GST and other applicable taxes if any etc. complete. (Proposed quantity may vary as per site condition)
Disposal of accumulated earth/debris to its original level, in moat area from George Gate to moat up to Out Gate and along Beach Road up to end of the moat including necessary loading and unloading charges etc. complete including cost, conveyance of all materials, labour charges and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials. (proposed quantity may be vary as per site condition)
KM INFRA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .