Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.0 LAdmitted-Finance | -26.00% | ₹30.0 L | L1 | Admitted-Finance |
| 2 | L2₹31.9 L+₹1.9 L (6.47%)Admitted-Finance | -21.21% | ₹31.9 L+₹1.9 L (6.47%) | L2 | Admitted-Finance |
| 3 | L3₹33.2 L+₹3.2 L (10.8%)Admitted-Finance | -17.99% | ₹33.2 L+₹3.2 L (10.8%) | L3 | Admitted-Finance |
| 4 | L4₹36.8 L+₹6.8 L (22.6%)Admitted-Finance | -9.24% | ₹36.8 L+₹6.8 L (22.6%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹40.5 L
EMD Value
₹81,019
Closing Date
16 Jul 2026, 3:00 pmClosed
Executive Engineer, PWD M-113(N), New Delhi-10
Executive Engineer, PWD M-113(N), New Delhi-10
AR and Mo various roads under division south west road-I during 2026-27. (SH Repair Replacement of damaged grills for improving Aesthetic view along central verge at Ring Road under Sub Division-II New Delhi).
2026_PWD_295031_1
25/EE/SWR-I/PWD/2026-27
Open Tender
Civil Works
Works
45 days
New Delhi
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹81,019
28 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 1.1 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 1.2 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | - | Cum | - | - |
| 2Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | |||||
| 2.1 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | - | Kg | 1 | - |
| 3Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : | |||||
| 3.1 | Two or more coats on new work. | - | Sqm | - | - |
| 4Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 4.1 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - |
| 4.2 | Modified estimated cost after using correction factor on DSR 2023 on account of GST @ 0.973 on DSR items | - | Nos. | 0.39 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
nit25.pdf
Tender Documents • 1.41 MB
BOQ_392492.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .