| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC AT PO HINJILICUT GANJAM | HINJILICUT | GANJAM | ODISHA | ₹13.2 L | L1 | Accepted-AOC As per Transparent lottery system |
| 2 | L2₹13.2 LRejected-AOC | ₹13.2 L | L2 | Rejected-AOC As per Transparent lottery system |
| 3 | L2₹13.2 LRejected-AOC AT PO BAULAGAON P S CHATRAPUR GANJAM ODISHA | CHATRAPUR | GANJAM | ODISHA | ₹13.2 L | L2 | Rejected-AOC As per Transparent lottery system |
Tender Value
₹15.6 L
EMD Value
₹15,556
Closing Date
18 Dec 2025, 5:00 pmClosed
EXECUTIVE OFFICER
HINJILICUT MUNICIPALITY
Construction of Gosala, Ward No.- 9 under Hinjilicut Municipality
2025_ORULB_122550_20
HIN-MUN-04/2025-26
Open Tender
Civil Works - Others
60 days
HINJILICUT MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹15,556
Yes
6 May 2026
7 Dec 2025
19 Dec 2025
7 Dec 2025
18 Dec 2025
7 Dec 2025
Earth work in excavation in Hard soil within 50 Mtr initial lead and 1.5 mtr. initial lift including rough dressing the bed as per direction of engineer in charge ( In Foundation & Plinth )
Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete.
Cement Concrete (1:3:6) using 40mm size hard black granite Crosser-broken metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C.
C.C. (1:2:4) with 12mm and down grade C.B. chips approved quality from approved quarry including hoisting, layingh hire charges of concrete mixture, vibrator, watering, curing and including cost, carriage, royality, cost of all labour T&P etc complete and as directed by E.I.C
R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement . R.C.C. foundation,Plinth Bend , footing bases of columns , mass concrete, Precast slabs etc.
R.C.C. Plinth Beam
Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete.
Providing Brick work with Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm. size having crushing sfength not less than 75 Kg./Crn2 with dimensional tolerance + 2 % in cement mortar ( 1 : 6 ) in foundation and plinth including the cost of all materials, labour carriage, royalty etc complete. Foundation & Plinth
Superstructure
16mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C.
2.5 cm thick A.S. flooring in Cement concrete ( 1: 2 : 4 ) including punning using 12 mm size hard granite broken chips….. Etc Complete.
Iron works wrought and put up at trusess and purlin fabrication and all cost of MS Square pipe, Angles, Flats , whereever necessary.
Supplying , fitting & fixing of M.S. GRILLS with all fittings & labour charges for fixing at site including all taxes , freight transportation , loading & unloading charges .
Supplying and fixing Colour Coated G.C.I. Profile sheet in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of G.C.I. sheet but excluding cost of iron fittings
Wall painting 2 coats with weather seal coat of approved shade two coats to give an even shade including cost of paint including priming 1 coat with any approved primer (Water Bond ) including cost of primer .
painting two coats with synthetic enamel paint over a coat pf primer of approved quality cost,conveyance,taxes of all materials,labour,T&P scaffolding,etc.
Providing 6" Dia Production Bore Well .( To be Paid As Per Actual )
Providing Electrification & other un seen Item
Providing Photographs , Placing & Fixing of transparency board at Work Site etc. complete .
Cost of Operation & Maintenance for a period of 3 years after the date of Completion ( Which will be Paid after completion of maintenance work , if Required during the O& M Period of 3 Years ) @ 3% of the Total Amount (A) .
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_569810.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_569810.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid