Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹4,656
Closing Date
4 Aug 2026, 6:00 pm
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_316530_12
e-NIT No. 55 REW UDHAMPUR of 2026-27 Dated 17-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹4,656
Yes
20 Jul 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 80% Qty. in A.k.S. and 20% O.R | 5.92 | cum | 568.4 | ₹3,364.93 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level(1:5:10) | 1.2 | cum | 5,672.73 | ₹6,807.28 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level(1:3:6) 70% Cement Concrete | 1.41 | cum | 6,602.15 | ₹9,309.03 |
| 4 | 30% Boulders | 0.6 | cum | 237.9 | ₹142.74 |
| 5 | P/L of Brick work in super structure using 1:6 mix of cement mortar | 3.45 | cum | 9,585.46 | ₹33,069.84 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.54 | cum | 8,665.27 | ₹22,009.79 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 0.87 | cum | 10,272.57 | ₹8,937.14 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal | 2.34 | cum | 10,698.72 | ₹25,035 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Cold twisted bars | 512.73 | kg | 123.2 | ₹63,168.34 |
| 10 | providing centering and shuttering including struting ,propping etc for foundations | 7.74 | sqm | 286.35 | ₹2,216.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1032459.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].