| 1 | 1₹7.1 LAccepted-Finance 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹7.1 L | 1 | Accepted-Finance Satisfied |
| 2 | 2₹7.3 LAccepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹7.3 L | 2 | Accepted-Finance Satisfied |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L2 | PREETHI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the cooling water pump motor from motor stool assembly, moving to repair bay and positioning on the spare motor stool assembly. Again lifting and moving towards the cooling water pump, positioning and reassembling the motor after completion of cooling water pump overhaul works. | 1 | No | 27,900 ₹27,900 | 27,400 ₹27,400 Lowest |
| 2.00 | Charges for dismantling the flexible coupling assembly, lock nut, bearing plate, thrust bearing, cooling coil & its cooling coil water lines and bearing oil pan. Cleaning and inspection of the components, bearing, renewing the worn-out components and reassembling Of Cooling Water pump. | 1 | No | 23,600 ₹23,600 | 23,150 ₹23,150 Lowest |
| 3.00 | Charges for dismantling of motor stool with pump components of Thrust block, Discharge elbow, Drive shaft, Element - III & II, Intermediate shaft top half coupling, Intermediate shaft, Element – I, pump shaft half coupling, Pump casing, Bearing housing, Pump shaft with impeller, Suction bell mouth assembly, Bell mouth liner, etc Of Cooling Water pump. | 1 | No | 93,300 ₹93,300 | 91,500 ₹91,500 Lowest |
| 4.00 | Charges for cutting and removal of existing worn-out shaft sleeves (SS) in impeller shaft bottom / impeller shaft top / Intermediate shaft / Drive shaft stuffing box sleeve and assembling of new sleeves by gas flame heating. Of Cooling Water pump. | 4 | Nos | 3,800 ₹15,200 | 3,720 ₹14,880 Lowest |
| 5.00 | Charges for lifting of impeller along with pump shaft, setting to the impeller stand, removing the impeller from the pump shaft by using hydraulic jack and gas flame heating over the impeller stem portion and reassembling of existing/new impeller with existing / new pump shaft and finally tightening of impeller lock nut and deflector with S.S. Allen screws and tag welding Of Cooling Water pump. | 1 | No | 20,350 ₹20,350 | 19,950 ₹19,950 Lowest |
| 6.00 | After completion of overhaul works, charges for measuring overall lift, providing correct lift and locking with lock nut. Alignment of cooling water pump with motor after tightening of motor bed bolts and finally observation and attending of minor defects noticed during trial run of cooling water pump. | 1 | No | 33,750 ₹33,750 | 33,100 ₹33,100 Lowest |
| 7.00 | Charges for loading and unloading the shafts and bushes . Cooling Water pump Capacity 16,000 M3/ Hr, Single Stage, VMF Model, 1175 KW motor to outside work shop. | 1 | set | 12,000 ₹12,000 | 11,800 ₹11,800 Lowest |
| 8.00 | Charges for cleaning and taking measurements of drive shaft, Intermediate shaft and pump shaft - 3Nos and checking the trueness of SS shaft of 2.2 meter length [800 kg of weight], machining of sleeve to required size and machining of OD of sleeve. | 1 | set | 35,400 ₹35,400 | 34,700 ₹34,700 Lowest |
| 9.00 | Charges for transporting of pump components such as element pipes I, II & III, pump casing, bearing housing, suction bell mouth assembly, bearing, shaft sleeve, stuffing box sleeve etc. from stores to site including devolution.(if necessary) | 1 | No | 4,300 ₹4,300 | 4,250 ₹4,250 Lowest |
| 10.00 | Charges for reconditioning of eroded / porosity of the suction bell mouth assembly by means of cast iron welding electrode over the circumference of 2.82 m of width = 15mm ( approx.) and grinding the seating surface of bell mouth liner in suction bell mouth assembly.(Necessary welding generator for welding works will be provided by Board at MTPS workshop. Welding rods are under contractor’s scope.)
(This work to be carried out at the time of overhauling, if necessary) | 2.82 | Mtrs | 2,400 ₹6,768 | 2,350 ₹6,627 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,900
Closing Date
9 Mar 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Unit IV Complete dismantling inspection Overhaul including renewal of wornout pump components and assembling of CWP 4B in stage II
2026_EB_664664_1
CE / MTPS-I / SE / M-I / CA / OT. 535 / 2025-26
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹6,900
Yes
14 Jul 2026
23 Feb 2026
10 Mar 2026
23 Feb 2026
9 Mar 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling the cooling water pump motor from motor stool assembly, moving to repair bay and positioning on the spare motor stool assembly. Again lifting and moving towards the cooling water pump, positioning and reassembling the motor after completion of cooling water pump overhaul works. | 1 | No | - | - |
| 2 | Charges for dismantling the flexible coupling assembly, lock nut, bearing plate, thrust bearing, cooling coil & its cooling coil water lines and bearing oil pan. Cleaning and inspection of the components, bearing, renewing the worn-out components and reassembling Of Cooling Water pump. | 1 | No | - | - |
| 3 | Charges for dismantling of motor stool with pump components of Thrust block, Discharge elbow, Drive shaft, Element - III & II, Intermediate shaft top half coupling, Intermediate shaft, Element – I, pump shaft half coupling, Pump casing, Bearing housing, Pump shaft with impeller, Suction bell mouth assembly, Bell mouth liner, etc Of Cooling Water pump. | 1 | No | - | - |
| 4 | Charges for cutting and removal of existing worn-out shaft sleeves (SS) in impeller shaft bottom / impeller shaft top / Intermediate shaft / Drive shaft stuffing box sleeve and assembling of new sleeves by gas flame heating. Of Cooling Water pump. | 4 | Nos | - | - |
| 5 | Charges for lifting of impeller along with pump shaft, setting to the impeller stand, removing the impeller from the pump shaft by using hydraulic jack and gas flame heating over the impeller stem portion and reassembling of existing/new impeller with existing / new pump shaft and finally tightening of impeller lock nut and deflector with S.S. Allen screws and tag welding Of Cooling Water pump. | 1 | No | - | - |
| 6 | After completion of overhaul works, charges for measuring overall lift, providing correct lift and locking with lock nut. Alignment of cooling water pump with motor after tightening of motor bed bolts and finally observation and attending of minor defects noticed during trial run of cooling water pump. | 1 | No | - | - |
| 7 | Charges for loading and unloading the shafts and bushes . Cooling Water pump Capacity 16,000 M3/ Hr, Single Stage, VMF Model, 1175 KW motor to outside work shop. | 1 | set | - | - |
| 8 | Charges for cleaning and taking measurements of drive shaft, Intermediate shaft and pump shaft - 3Nos and checking the trueness of SS shaft of 2.2 meter length [800 kg of weight], machining of sleeve to required size and machining of OD of sleeve. | 1 | set | - | - |
| 9 | Charges for transporting of pump components such as element pipes I, II & III, pump casing, bearing housing, suction bell mouth assembly, bearing, shaft sleeve, stuffing box sleeve etc. from stores to site including devolution.(if necessary) | 1 | No | - | - |
| 10 | Charges for reconditioning of eroded / porosity of the suction bell mouth assembly by means of cast iron welding electrode over the circumference of 2.82 m of width = 15mm ( approx.) and grinding the seating surface of bell mouth liner in suction bell mouth assembly.(Necessary welding generator for welding works will be provided by Board at MTPS workshop. Welding rods are under contractor’s scope.)
(This work to be carried out at the time of overhauling, if necessary) | 2.82 | Mtrs | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_798185.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].