| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹18.4 L+₹59,781.33 (3.36%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹20.2 L+₹2.4 L (13.3%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹21.7 L
EMD Value
₹43,320
Closing Date
27 Feb 2026, 4:30 pmClosed
PEK
Sanat Ghar Bemina
Construction of Toilet block at Emporium Garden Srinagar for visitors
2026_SICOP_303976_1
51a-PEK of 2025-26 dated 20/02/2026
Open Tender
Civil Works
Percentage
90 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
PEK
₹43,320
7 Mar 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation by Mechanical means including disposal of excavated earth upto the lead of 50 mtr. | 8 | Hrs | 1,200 | ₹9,600 |
| 2 | Earth work in excavation in all Kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth 1.5 m in width as well as 10 Sqm on plan) including disposal of excavated earth, lead up to 50mtr. | 65.11 | Cum | 256 | ₹16,668.16 |
| 3 | Supplying /filling dry stone soling tightly hand packed under foundation & under floors including all leads, lifts and all carriages up to site of work complete. | 7.36 | Cum | 750 | ₹5,520 |
| 4 | P/L of cement concrete 1:4:8 mix using 40mm N/size Agg. In foundation /plinth excluding cost of shuttering complete job. | 4.85 | Cum | 5,000 | ₹24,250 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work upto plinth level in 1:1.5:3 mix using 20mm N/size using crushed aggregate including all carriages upto site of work complete. | 16.28 | Cum | 7,000 | ₹1,13,960 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work upto plinth level in 1:3:6 mix using 20mm N/size using crushed aggregate including all carriages upto site of work complete | 39.84 | Cun | 5,500 | ₹2,19,120 |
| 7 | Supplying and filling in plinth with fine sand/GSB under floors including, watering, ramming, consolidating and dressing complete. | 41.63 | Cum | 850 | ₹35,385.5 |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. 50 mm thick with 20mm nominal size stone aggregate. | 39.03 | Sqm | 500 | ₹19,515 |
| 9 | Centering and shuttering including strutting ,propping etc. and removal of form work for:
a) foundation, footing ,bases for columns | 93.68 | sqm | 280 | ₹26,230.4 |
| 9.01 | (B) Slabs | 48.32 | sqm | 350 | ₹16,912 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
51aSBD.pdf
Tender Documents • 0.84 MB
BOQ_987284.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .