| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.1 L+₹27,041.82 (3.95%)Rejected-AOC | ₹7.1 L+₹27,041.82 (3.95%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹7.1 L+₹27,112.14 (3.96%)Rejected-AOC | ₹7.1 L+₹27,112.14 (3.96%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹7.3 L+₹43,736.03 (6.39%)Rejected-AOC | ₹7.3 L+₹43,736.03 (6.39%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹7.3 L+₹50,366.63 (7.36%)Rejected-AOC | ₹7.3 L+₹50,366.63 (7.36%) | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | INTELECT TECHNOLOGIES L4 | rvk construction L1 | PRAVILA BULDERS L5 | S.P BUILDERS L6 | SRI MARUTHAMALAYAAN ENGINEERS L3 | S.K.Builders L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 94 | m3 | 191.4 ₹17,991.6 | 115 ₹10,810 | 100 ₹9,400 | 193.57 ₹18,195.58 | 0.44 ₹41.36 Lowest | 187 ₹17,578 |
| 2.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 10 | m3 | 5,186.94 ₹51,869.4 | 4,800 ₹48,000 | 5,000 ₹50,000 | 5,246.33 ₹52,463.3 | 4,000 ₹40,000 Lowest | 5,081 ₹50,810 |
| 3.00 | Centering with steel centering for revetment, drain and culvert Above 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (above 4 Feet) | 230 | m2 | 464.58 ₹1,06,853.4 | 330 ₹75,900 Lowest | 500 ₹1,15,000 | 469.95 ₹1,08,088.5 | 470 ₹1,08,100 | 454 ₹1,04,420 |
| 4.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 39 | m3 | 5,847.27 ₹2,28,043.53 | 6,100 ₹2,37,900 | 6,600 ₹2,57,400 | 5,914.3 ₹2,30,657.7 | 6,500 ₹2,53,500 | 5,713 ₹2,22,807 Lowest |
| 5.00 | Plain cement concrete 1:2:4 mix (One cement two M.Sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 (detailed data for 10 m3 ) | 4 | m3 | 6,321.42 ₹25,269.88 | 270 ₹1,079.33 Lowest | 6,000 ₹23,985 | 6,394.09 ₹25,560.37 | 6,500 ₹25,983.75 | 6,177 ₹24,692.56 |
| 6.00 | Plastering with cement mortar 1: 5 mix (One cement and five sand) 12 mm thick including cost and conveyance of all materials,finishing,curing,and all labour chargesetc.completeas Standard specification. | 43 | m2 | 268.83 ₹11,559.69 | 560 ₹24,080 | 100 ₹4,300 Lowest | 272.39 ₹11,712.77 | 244 ₹10,492 | 263 ₹11,309 |
| 7.00 | Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs,
sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C Part-II | 58 | m2 | 619.44 ₹35,927.52 | 560 ₹32,480 Lowest | 700 ₹40,600 | 626.6 ₹36,342.8 | 600 ₹34,800 | 605 ₹35,090 |
| 8.00 | Supplying fabricationg and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc.., | 9.1 | Qtl | 8,301.54 ₹75,520.77 | 8,200 ₹74,597.04 | 9,000 ₹81,874.8 | 8,396.13 ₹76,381.27 | 8,500 ₹77,326.2 | 8,110 ₹73,778.29 Lowest |
| 9.00 | Reinforced cement concrete M20 (Mix 1:1 1/2 :3 one part of cement one half parts of sand and three part of 20mm hard blue granite metal by volume , characteristic strength not less then 20N / sqmm machine mixed, for all reinforced cement concrete works, including scaffolding, cost of all materials, machine mixing vibrating, lifting curing, labour charges for laying &finishing etc but excluding centering and from work etc complete complying with the relevant standard specifications at all leads inside the building | 13 | m3 | 7,391.52 ₹96,060.19 | 8,300 ₹1,07,866.8 | 8,000 ₹1,03,968 | 7,475.79 ₹97,155.37 | 7,500 ₹97,470 | 7,215 ₹93,766.14 Lowest |
| 10.00 | Supplying and fixing of SFRC Man Hole Cover (Heavy duty square ) etc., complete | 30 | Nos | 2,349.87 ₹70,496.1 | 2,100 ₹63,000 | 1,450 ₹43,500 Lowest | 2,376.6 ₹71,298 | 2,000 ₹60,000 | 2,296 ₹68,880 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Jun 2026, 3:00 pmClosed
Assisstant Commissioner-West Zone
West Zone, Coimbatore Corporation
Construction of Storm Water Drain at Onapalayam in ward no 38 of west zone.
2026_MAWS_681513_34
E1/WESTZONE/2026
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per document attached
4 documents required · 4 mandatory
₹0
₹10,000
Yes
27 Aug 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
24 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 94 | m3 | - | - |
| 2 | Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 10 | m3 | - | - |
| 3 | Centering with steel centering for revetment, drain and culvert Above 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (above 4 Feet) | 230 | m2 | - | - |
| 4 | Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 39 | m3 | - | - |
| 5 | Plain cement concrete 1:2:4 mix (One cement two M.Sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 (detailed data for 10 m3 ) | 4 | m3 | - | - |
| 6 | Plastering with cement mortar 1: 5 mix (One cement and five sand) 12 mm thick including cost and conveyance of all materials,finishing,curing,and all labour chargesetc.completeas Standard specification. | 43 | m2 | - | - |
| 7 | Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs,
sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C Part-II | 58 | m2 | - | - |
| 8 | Supplying fabricationg and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc.., | 9.1 | Qtl | - | - |
| 9 | Reinforced cement concrete M20 (Mix 1:1 1/2 :3 one part of cement one half parts of sand and three part of 20mm hard blue granite metal by volume , characteristic strength not less then 20N / sqmm machine mixed, for all reinforced cement concrete works, including scaffolding, cost of all materials, machine mixing vibrating, lifting curing, labour charges for laying &finishing etc but excluding centering and from work etc complete complying with the relevant standard specifications at all leads inside the building | 13 | m3 | - | - |
| 10 | Supplying and fixing of SFRC Man Hole Cover (Heavy duty square ) etc., complete | 30 | Nos | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.88 MB
SWD.pdf
Tender Documents • 0.85 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_819266.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .